Luton-10
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,828
Likes: 0
Received 0 Likes
on
0 Posts
Twitter account said "Attention: Due to significant wind conditions, the #LutonDART service is on a temporary hold. Replacement bus services are in operation. Please allocate extra time for your journey."
At the time wasn't the Dartford Road crossing over the Thames suspended?
Maybe there is a H&S clause once wind conditions go over a curtain amount?
At the time wasn't the Dartford Road crossing over the Thames suspended?
Maybe there is a H&S clause once wind conditions go over a curtain amount?
Don't think the Dartford Road crossing is comparable to the DART, for the reasons stated by Spanish Eyes. Same for aircraft - slightly different operational environments...
Join Date: Jul 2006
Location: Oh Cavey
Posts: 283
Likes: 0
Received 0 Likes
on
0 Posts
This chart suggests it's occurred every year in the past ten, so not very rare.
https://windy.app/forecast2/spot/243...ort/statistics
https://windy.app/forecast2/spot/243...ort/statistics
Seeing you are asking the airport should be kept under the ownership of the council but greed and incompetence took over as income to LRT from the airport is being used for debt interest payments instead of dividends, which remain at zero.
If the airport was left at 18m then that would secure the airports future. It is now looking like LRT will borrow more money to finance phase 1 if approved, which further risks the airport of a takeover. The whole point of the concession is that the concessionaire takes the risks.
Let’s not forget that LRT is only here today due to a bailout by a council despite being created as a zero risk company to just collect concession fees and rents with no staff.
The town needs diversity not a single source employment choice for job creation where 24/7 becomes the only option.
These are all points I have said before so it is time to move on and get back to the airport, as no one is interested in my rants.
If the airport was left at 18m then that would secure the airports future. It is now looking like LRT will borrow more money to finance phase 1 if approved, which further risks the airport of a takeover. The whole point of the concession is that the concessionaire takes the risks.
Let’s not forget that LRT is only here today due to a bailout by a council despite being created as a zero risk company to just collect concession fees and rents with no staff.
The town needs diversity not a single source employment choice for job creation where 24/7 becomes the only option.
These are all points I have said before so it is time to move on and get back to the airport, as no one is interested in my rants.
Join Date: Jun 2014
Location: Just out of sight
Posts: 44
Likes: 0
Received 0 Likes
on
0 Posts
Since the fire, and no doubt as a result of it, the government has issued new guidelines outlining some design aspects to be considered in multi-storey car park design for EVs.
https://assets.publishing.service.go...c-vehicles.pdf
Among these are:• Suppression systems
• Increased structural fire resistances
• Distance between parked cars
• Firefighting water supplies
• Water run-off control and containment
• Locations and features of EV chargepoints
• Enhanced smoke management systems
• Thermal imaging cameras and other early detection methods, to enable early intervention
This looks likely to significantly increase the cost compared to the original car park, with potentially reduced revenue from wider spacing between vehicles.
https://assets.publishing.service.go...c-vehicles.pdf
Among these are:• Suppression systems
• Increased structural fire resistances
• Distance between parked cars
• Firefighting water supplies
• Water run-off control and containment
• Locations and features of EV chargepoints
• Enhanced smoke management systems
• Thermal imaging cameras and other early detection methods, to enable early intervention
This looks likely to significantly increase the cost compared to the original car park, with potentially reduced revenue from wider spacing between vehicles.
Paxing All Over The World
Over the last 20 years almost every new parking space - indoors out out - has had the spaces marked smaller. This, I suspect, is to pretend that they have provided more spaces than they have. Over the same time, it is well known that vehicles have got bigger. My car is a very reglar size and I find that some parking spaces are too small for it - if you then want to get out between you and the next vehicle.
Last edited by PAXboy; 3rd Jan 2024 at 23:44.
Join Date: Nov 2001
Location: London Whipsnade Wildlife Park
Posts: 5,039
Likes: 0
Received 0 Likes
on
0 Posts
Over the last 20 years almost every new parking space - indoors out out - has had the spaces marked smaller. This, I suspect, is to pretend that they have provided more spaces than they have. Over the same time, it is well known that vehicles have got bigger. My car is a vbery ruglar size and I find that some parking spaces are too small for it - if you then want to get out between you and the next vehicle.
What is the timescale for the replacement multi storey to be opened? Mega lost income for the airport during the interim. Getting reimbursed might take years, if the settlements end up in the courts.
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,828
Likes: 0
Received 0 Likes
on
0 Posts
Thread Starter
Join Date: Jul 2016
Location: Between the check-in desks
Posts: 446
Received 0 Likes
on
0 Posts
More of a case of Luton Rising having no faith in the product seeing that one third of it is underground, one third is in a deep cutting while only one third is above the ground but below the runway and hill top.
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,828
Likes: 0
Received 0 Likes
on
0 Posts
Buster was going to buy a Toyota Supra, but car parking sizes meant that I might have been able to get out of the car, but depending upon how close another car parked alongside, unable to get back in! Just like many SUVs, cars designed for American sized car parking spaces.
What is the timescale for the replacement multi storey to be opened? Mega lost income for the airport during the interim. Getting reimbursed might take years, if the settlements end up in the courts.
What is the timescale for the replacement multi storey to be opened? Mega lost income for the airport during the interim. Getting reimbursed might take years, if the settlements end up in the courts.
http://BBC News - Dismantling of Lut...herts-67877365
Join Date: Jul 2006
Location: Oh Cavey
Posts: 283
Likes: 0
Received 0 Likes
on
0 Posts
if you have health and safety responsibilities then you have to take them seriously. One third of that track is exposed, doesn’t matter if it is 100 metres of track or 1000 metres of track, it is still exposed.
i think there are a few people on this forum that just like to have a dig because they don’t get any come back to their comments but they don’t actually have a clue of operating a business in the real world.
Thread Starter
Join Date: Jul 2016
Location: Between the check-in desks
Posts: 446
Received 0 Likes
on
0 Posts
Just an observation but the trains operated, the buses operated, the aircraft operated but the £300m plus Dart couldn’t and it wasn’t even a crosswind but straight down the track. Is it your opinion that the Dart could have been blown off the tracks?
As for manufacturers safety limits, if the Dart was the manufacturer’s cable car than it could have operated in up to 100km winds according to their website. It seems something that is attached to the ground can’t but maybe the track was built on the cheap?
As for manufacturers safety limits, if the Dart was the manufacturer’s cable car than it could have operated in up to 100km winds according to their website. It seems something that is attached to the ground can’t but maybe the track was built on the cheap?
Last edited by Spanish eyes; 4th Jan 2024 at 14:00.
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,828
Likes: 0
Received 0 Likes
on
0 Posts
It may not have been a wind issue as you say "one third is in a deep cutting"
Maybe risk of rainfall collection.
We have all seen what has occurred in the Road tunnel before.
Maybe risk of rainfall collection.
We have all seen what has occurred in the Road tunnel before.
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,828
Likes: 0
Received 0 Likes
on
0 Posts
Drop Off charges
Always a hot topic on this forum
https://simpleflying.com/london-gatw...p-off-charges/
https://simpleflying.com/london-gatw...p-off-charges/