Go Back  PPRuNe Forums > Non-Airline Forums > Private Flying
Reload this Page >

Container shipping a plane

Wikiposts
Search
Private Flying LAA/BMAA/BGA/BPA The sheer pleasure of flight.

Container shipping a plane

Thread Tools
 
Search this Thread
 
Old 5th Apr 2015, 02:02
  #1 (permalink)  
Thread Starter
 
Join Date: Jan 2008
Location: Canada
Posts: 631
Likes: 0
Received 0 Likes on 0 Posts
Container shipping a plane

What follows is my recounting my recent Transatlantic shipping of a damaged plane, in a container. Though I realize this is specialized, low frequency event, I want this information to reside here, simply so someone searching in the future will be able to find it and be able to benefit from my experience. To be truthful, I don't expect most readers to read all of this, but it's a record for the future....So, comments are certainly welcome. I do understand that this is kind of a dead end thread topic. However, if you have your own tale of shipping a plane, we'd be delighted to hear your experience!

NOTE: The following is my experience, with advice from others, as I will present it. This was a first/onetime experience for me, I cannot assure that the experience nor equipment (the container itself) would be the same for the next person, so do your planning. But I hope this tale helps you in knowing what questions to ask....


Word came to me that a Teal amphibian in England had been damaged, my interest was piqued. I inquired a bit, and realized that it was not going to be repaired, and to see it go for scrap would be a shame, for a rather rare type. So, those "friends" we all have, talked me into bidding on the salvage from the insurer. I won the bid! It felt like the dog must feel, when he chases the car down the road, and the car stops for him - now what? Oh, and by the way, it's November, and they would rather the bent plane not tie up hangar space, desired for a plane which would actually come and go, would I kindly take away my prize...

So, a container would be needed, I started asking advice. I got some, though surprisingly little. I did find a delightfully helpful fellow in Toronto, in the business of "logistics" and he could make the required container arrangements. Ultimately, 100% service from him, highly recommended!

But information on the actual details of loading an odd cargo into a container was few and far between. Three things conspired to greatly complicate this operation: I was told that I would have two hours from container arrival at the airport, to its being driven away, to load it. I had never before seen the inside of a container, so I did not know what hooks and hardpoints are available to tie the plane's parts in. I was warned that some containers have none, and the cargo must be braced in with timber. And... the arrival of timber into Canada is strictly regulated for invasive bugs. Only certain timber qualifies, and it is not easy to obtain. I inquired in advance, and your local English timber merchants do not sell it.

So, at worst, I would have to load a plane in pieces, and design and execute its security in two hours! Well, that is unrealistic! So, I had to eliminate unknowns, this was my first time. To have the container delivered and "left" for two days would cost an extra $900. Yes, I would have to do that, to have the time, to load and secure. That was $900 well spent. I was told that I could not have the container set off the trailer on the floor, so I would have to lift everything up to load it. I knew that I would not have a fork lift, nor crane. But three engine hoists lent to me did the job slow and easy.

The container arrived. It was very kindly allowed into the hangar, so all my work was indoors. Excellent, accommodating driver. Ahhhhh, it had lots of tiedown points welded in along the floor and ceiling. Timber cribbing inside would not be required. Instead, I bought out all the ratchet straps from the local timber store. They were perplexed at my bulk purchase, and entertained by my explanation. The container also had a wooden floor. I had been told, and confirmed with the driver, that I could screw into the floor to secure things, as long as I did not wreck the floor, or put holes "that you could see daylight through". So I also purchased super lag screws for this purpose.

I had found in the hangar, a lonely pallet (we call them "skids" in Canada), which bore a burned in brand reading "CN-124 HT-44-DB". Before leaving Canada, I had called the proper government authority, to ask how to select timber which complied with the requirements for import to Canada. I truly do not want to be the guy who imports bugs to kill more of our beautiful forests. My main question was, would the very common "pressure treated" timber found in England be acceptable. No, it would not. Any wood products either had to be composite, like plywood or chip board, or marked as having been heat treated. So the code branded into the skid was promising - I decoded the "HT" part to mean heat treated. The shipping logistics fellow warned me severely that if I got that wrong, and non conforming plank timber was found in the container during Canadian inspection, the container would be held for fumigation, and I would have a large bill to pay. So, I aimed to keep my use of any wood product to a minimum. I used that pallet, and only a few other particle board spacers.

The Teal has a pylon mounted engine, which is secured to the top of the fuselage at three bolt through fork fittings. I welded up three bolt down plates with required angled tabs, and holes, so I could screw them to the pallet. Then, I would mount the pylon to the pallet as though it was the top of the fuselage, and just slide the pylon/engine/propeller into the container whole. I reasoned that then the engine and prop were happily sitting in the engine mount, as intended in their design, and would best withstand travel forces. The fuselage happily sat on the floor of the container on its gear legs, with the wheels and axles removed to wit the width, so supporting the fuselage was no concern.

My challenge was that I did not know what the forces which could reasonably be encountered in transit would be. Many people gave me varying advice, but not with values. I found some web information in a table from the International Maritime Organization. The summary of that was rail could cause 4G forward/backward, and 1/2G sideways. Road could cause 1G forward/backward, and 1/2G sideways. And sea could cause a maximum of 0.8G in any direction. Though I was not told so, I had to presume that the container could travel by train, and indeed, it did. I also wondered about the port crane handling of the container, but there are no force values I could find for this.

The pallet mounted engine/propeller and pylon was my vulnerable portion of the load. The engine and propeller weigh 340 pounds, so allow for 400 pounds with pylon, exhaust, cowls etc. 400 pounds X 4G = 1600 pounds force. I used 1800 pound ultimate strength ratchet straps in four directions from the engine lift lug. That arrangement provided a maximum of 2500 pounds forward/rearward/sideward, and 1800 pounds at a 45 degree angle. So 6G restraint capacity, where 4G is recommended. In hind sight, the 1” wide, 1800 pound straps worked, but I would rather have bought heavier straps.

Having received the shipment, it held. But, the straps had loosened during the transit, allowing the pallet to rip through the four screws which held it down to the container floor. Note to self, big washers for the lag screws next time. This brings to mind several thoughts about straps: they will elongate 7 to 15% as they take up their maximum capacity. It would seem that they had stretched, and not completely returned. So, if the calculations for strap capacity are getting toward their ultimate capacity value, allow for some stretch, and resulting load shift. With the stretch, and not completely returning, the hooks could have jumped off the hardpoint loops in the container, then the strap would be useless. This did not happen to me – lucky! Next time, I would wrap vinyl tape around the hook so as to close it, so it could not jump off if loose. Similarly, the ratchet could have released, so for the effort it would take, I would wrap the ratchet closed with vinyl tape too.

Otherwise, all the other parts of the plane I strapped in, stayed put well. Lots of tires, and some foam and plastic padding kept things safe. The tractor truck returned as planned to take the container away.. The driver coupled the tractor to the trailer. This included “pinning it” in which the driver engages the king pin of the trainer with gusto, to assure it latched. Suddenly, that solid steel fortress I’d been working in for two days, bounced around like a tissue box! I looked, and asked the driver to look inside. All was still okay, first test passed. He assured me my tiedown job was fine, and he’d seen a lot worse. I closed the door, and applied the sealing “bolts”. I photographed their numbers. Then I remembered that I had forgotten to photograph my loading job! Too late! Of course, as the shipment left that hangar, drawn by the tractor, I began to worry, and kept worrying for four weeks that my tiedown job was inadequate. Of course, people I discussed this with started recounting their own horror stories of shipments gone wrong. This included a friend, who told me that one of his youthful summer jobs was unloading containerized new Cessna 152’s. He said that everyone came in damaged – despite being professionally packed.

So, once it’s all packed in, stop and take a look... Would be okay with the entire container being laid on its side? Dropped on either end? If the tiedowns stretched 10%, would anything move so as to create a problem? What if it were laid on one side, then the other, a hundred times a day for a week?

From my arrival to the plane, whose wings and tail were already removed, it took me three days to load and secure to my satisfaction. I had attempted to hire out this work, but had no takers. In hind sight, I would probably not have been happy with someone who was not experienced, doing this work for me, and they would not be happy to do it. I was not experienced, applied only a small excess. A lot of luck got the plane here safely. I don’t know where one finds “pros” for this, but if they cannot be found, it might not be worth attempting at all. These decisions should obviously be made before bidding in the first place!

Though I was not specifically asked, I drained all liquids, and removed the battery from the plane.

As I was outside Canada when the container arrived, a friend had to unload it for me. I had written notes, and he told me he had no difficulty whatever. It took him 40 minutes, of the allowed 2 hours (before overtime charges).

All shipping costs included (but not my time and travel) containering the plane England to Canada cost CDN$8000, and took four weeks.

My effort was made much more easy with the kind help of the people of Modern Air, of Fowlmere. A local flier went out of his way to make it a great visit for me, and I caught up with a couple of PPRuNer's too!


Things you should consider having available to container a plane:

A step ladder (to get into the container many times, and to reach inside the container to strap to the ceiling fittings), hoists as required (or forklift/crane available s needed), lots of tiedown straps, whose capacity is at least six times the weight they will individually restrain, lots of padding, tires, foam, a measuring tape to help plan your loading, magnetic work lights to provide light in the container, tiewraps and tape for securing things, clear plastic sheet or heavy paper to protect surfaces from the straps, ¼” size lag screws and washers for screwing to the container floor, and heat treated timber and pallets as you might require.
9 lives is offline  
Old 5th Apr 2015, 03:53
  #2 (permalink)  
 
Join Date: Dec 2003
Location: Australia
Posts: 926
Likes: 0
Received 0 Likes on 0 Posts
Good write-up.
A couple of points from my experience.
1. Remember the dimensions of the container, and the dimensions of the container door, are not the same! The container door is slightly smaller than the container. An inch/cm off can ruin your day.
2. If possible, get the container delivered by a side loader truck, so they can drop the container on the ground, and then pick it up to put back on the truck.
3. If no side loader, a tilt tray tow truck can often be used to get the load up to height of container on truck.
4. As you noted, timber used for packing needs to be acceptable for quarantine purposes at delivery end. I think the international standard is called ISPM 15 timber.
5. A "High Cube" Container is 300mm/1 ft taller than a standard container.

Last edited by rjtjrt; 6th Apr 2015 at 21:42. Reason: Forgot something.
rjtjrt is offline  
Old 5th Apr 2015, 09:16
  #3 (permalink)  
 
Join Date: Apr 1999
Location: In front of a computer
Posts: 2,356
Received 89 Likes on 34 Posts
Great write up...thanks

Guess this is your new baby?


ETOPS is offline  
Old 5th Apr 2015, 09:36
  #4 (permalink)  
 
Join Date: Feb 2008
Location: Germany
Posts: 560
Received 0 Likes on 0 Posts
Thurston Teal Amphibian News 2003

Probably mentioned in this interesting blog!
Newforest2 is offline  
Old 5th Apr 2015, 13:49
  #5 (permalink)  
 
Join Date: Jun 2002
Location: Munich MUC/EDDM
Posts: 6,641
Received 74 Likes on 46 Posts
Fascinating write-up, thank you. It reminded me of a time I took an open glider trailer to Idaho and had to modify it on-site to bring a Blanik back to Canada. Not on the scale of your adventure, but at least I didn't have to worry about the wood I used meeting quarantine requirements!

What was the damage to the Teal? Do you have any pictures of your trip?

Last edited by India Four Two; 5th Apr 2015 at 14:48.
India Four Two is offline  
Old 6th Apr 2015, 19:05
  #6 (permalink)  
 
Join Date: Dec 2004
Location: East Anglia
Posts: 832
Likes: 0
Received 0 Likes on 0 Posts
I have helped ship several aerobatic aircraft in containers including my own one. I have seen between 5 and 8G on the G meter when the containers were opened. I think others have seen more.

I would therefore think that this was a bit optimistic:

was rail could cause 4G forward/backward, and 1/2G sideways. Road could cause 1G forward/backward, and 1/2G sideways. And sea could cause a maximum of 0.8G in any direction.
I think the loading and unloading (dropping) probably give the highest load. We ship with the aircraft suspended from the wing mountings as most undercarriages aren't good for 6 G.
Zulu Alpha is offline  
Old 9th Apr 2015, 08:52
  #7 (permalink)  
 
Join Date: Jan 1999
Location: north of barlu
Posts: 6,207
Likes: 0
Received 0 Likes on 0 Posts
Chains

I don't have much to add to the advice above except to say that we shipped a lot of aircraft across the Atlantic during the 80's & 90's and found that most of the damage was as a result of ropes and nylon ratchet straps coming loose during the sea journey.

Eventually we used hooks chains and turnbuckles to secure the aircraft, if the situation required something soft to secure the aircraft we used the shortest rope we could and tensioned it with chains & a turnbuckle.

After a few lessons we had a zero damage shipments but I dread to think what the security people were thinking when they x-rayed my chain filled suit case on the way out to the USA !
A and C is offline  
Old 9th Apr 2015, 11:14
  #8 (permalink)  
Thread Starter
 
Join Date: Jan 2008
Location: Canada
Posts: 631
Likes: 0
Received 0 Likes on 0 Posts
A & C, In hindsight, I agree with you. I did think about it at the time, and feared that the chains with no stretch would stock load, and risk breaking the Lycoming lift lug I'd used as an anchor horizontally. However, the straps had come loose, as you say, so I have learned a lesson, and would do it differently next time!

Good advice for the person who ((hopefully) searches and finds this thread before they load their prize!
9 lives is offline  
Old 9th Apr 2015, 13:00
  #9 (permalink)  
 
Join Date: Aug 2010
Location: Northampton UK
Posts: 106
Likes: 0
Received 0 Likes on 0 Posts
A dear friend bought a 150 very cheaply while in the US on holiday (!) and made a deal with a UK tyre distributor to ship it home in one of their containers along with the tyres. It arrived without further damage (he soon discovered why it was so cheap!) thanks to the packing effect of the tyres.

The most exciting part of his trip was driving the plane in a rented U-Haul van to the port in Miami. They passed a sign saying "All trucks must stop" thinking "that's OK, it's a van, not a truck". The lady Highway Patrol officer who pulled them over did not agree, and said she couldn't see why they were shipping "that pile of junk" to England. She was right.

PS. Excellent write up, thank you very much.
Victorian is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.