MANCHESTER 1
Join Date: Jul 2007
Location: UK
Posts: 355
Likes: 0
Received 0 Likes
on
0 Posts
What about the new bus facility and car park near the RVP.
They have had planning permission on this for some time now and I thought it was essential for the TP that this be up and running before they could start on any of the main TP.
They have had planning permission on this for some time now and I thought it was essential for the TP that this be up and running before they could start on any of the main TP.
Join Date: Dec 2003
Location: uk
Posts: 1,578
Likes: 0
Received 0 Likes
on
0 Posts
Written evidence - Manchester Airport
Bit weighty but possibly of interest to parish members with a more technical interest in Manchester.
Bit weighty but possibly of interest to parish members with a more technical interest in Manchester.
Join Date: Jan 2013
Location: London
Posts: 2,962
Likes: 0
Received 0 Likes
on
0 Posts
Roverman,
No need to steady on in my part, The April start quotes come directly from MAG, and I was under the impression a construction firm had been picked. Forget the name but it was a someone&someone company (vague but like I say, completely forgot the name.
No need to steady on in my part, The April start quotes come directly from MAG, and I was under the impression a construction firm had been picked. Forget the name but it was a someone&someone company (vague but like I say, completely forgot the name.
Join Date: Jul 2006
Location: 2 DME
Age: 54
Posts: 241
Likes: 0
Received 0 Likes
on
0 Posts
I think Ethiopia posts the news to promote their own blog/site, so, probably knew the news had been posted already.
In terms of T3, one of the video blurbs to accompany the fly through showed Brad Miller and he clearly said 'T3 will also be enlarged', so, it's probably to be released at a later date.
MAG still confident that the main build (in terms of the actual start of the T2 TP) will be starting next month.
In terms of T3, one of the video blurbs to accompany the fly through showed Brad Miller and he clearly said 'T3 will also be enlarged', so, it's probably to be released at a later date.
MAG still confident that the main build (in terms of the actual start of the T2 TP) will be starting next month.
Join Date: Feb 2016
Location: Leeds
Posts: 496
Likes: 0
Received 0 Likes
on
0 Posts
T3 to the north and east, I think that a re-sited T3 more towards the station would allow a larger and more simplified airside pier system that could be set out to help the LoCo's.
With T1 due to be demolished, a reorganised landside road and building system would release the extra land to be used airside.
Join Date: Sep 2009
Location: England
Posts: 1,008
Likes: 0
Received 0 Likes
on
0 Posts
There's some slight airside happening soon, mainly the enlargement of T1 bussing lounge (gate 20). I presume this is related to the overall new developments we'll see over the coming years.
Link here
Link here
Join Date: Feb 2016
Location: Leeds
Posts: 496
Likes: 0
Received 0 Likes
on
0 Posts
TCX - SFO
To confirm, should we not read to much into the removal of this route from the planned S17 schedule?
I understand it is not unusual, but previous reports (e.g routesonline) of the route starting have been removed and replaced with reports that do not mention the new route.
I understand it is not unusual, but previous reports (e.g routesonline) of the route starting have been removed and replaced with reports that do not mention the new route.
Join Date: Jan 2013
Location: London
Posts: 2,962
Likes: 0
Received 0 Likes
on
0 Posts
The route is still a year away from launch so it will appear and re-appear.
It's still on airline route and it was on the website yesterday. It's not been officially launched yet so no need to worry.
It's still on airline route and it was on the website yesterday. It's not been officially launched yet so no need to worry.
Join Date: Feb 2016
Location: Leeds
Posts: 496
Likes: 0
Received 0 Likes
on
0 Posts
Thanks!
Should get the February stats soon. Be interesting to see how much it has jumped from 2015 (accounting for the fact that this is a leap year).
Have to say I'm surprised that the far north-western pier on the revamped T2 is not to be immediately provided. I thought that pier would be the first one to be constructed, adding capacity in an area that would be largely new build.
Should get the February stats soon. Be interesting to see how much it has jumped from 2015 (accounting for the fact that this is a leap year).
Have to say I'm surprised that the far north-western pier on the revamped T2 is not to be immediately provided. I thought that pier would be the first one to be constructed, adding capacity in an area that would be largely new build.
Last edited by Dobbo_Dobbo; 29th Feb 2016 at 22:41.
Have to say I'm surprised that the far north-eastern pier on the revamped T2 is not to be immediately provided