AUKUS

Joined: Dec 2001
Aviation Qualifications: Military
Posts: 2,983
Likes: 488
From: The Roman Empire
Build submarines in 18 months.
Build 1.5 million new homes by 2030
Achieve 95% clean energy by 2030
Labour politicians (and probably ALL politicians) never let practical realities get in the way of their promises/pledges/commitments, which are often timed far enough for delivery in the future that they know they'll have moved on and not be held responsible for failure.
Build 1.5 million new homes by 2030
Achieve 95% clean energy by 2030
Labour politicians (and probably ALL politicians) never let practical realities get in the way of their promises/pledges/commitments, which are often timed far enough for delivery in the future that they know they'll have moved on and not be held responsible for failure.

Joined: Apr 2006
Posts: 813
Likes: 429
From: Portsmouth
That's what you get with placemen pollies. they don't understand their briefing notes.
I suspect what he meant was interval between deliveries, as opposed to total production time. It is clearly madness to suggest that - particularly the way BAES operates - one could build a boat in 18 months. On the other hand, it is also madness to continue building boats such that it takes twelve years between cutting steel and going on sea trials.
It won't be easy, but it has to be done. Ir also means the arguments about build capacity vs number of boats will need revisiting.
I suspect what he meant was interval between deliveries, as opposed to total production time. It is clearly madness to suggest that - particularly the way BAES operates - one could build a boat in 18 months. On the other hand, it is also madness to continue building boats such that it takes twelve years between cutting steel and going on sea trials.
It won't be easy, but it has to be done. Ir also means the arguments about build capacity vs number of boats will need revisiting.
Thread Starter
Ecce Homo! Loquitur...

Joined: Jul 2000
Aviation Qualifications: Spotter
Posts: 24,637
Likes: 7,338
From: Peripatetic
On the other hand, it is also madness to continue building boats such that it takes twelve years between cutting steel and going on sea trials.
Now, especially at RR who now have to increase their production rate to accommodate the Australian SSN-A reactor modules as well as RN orders, that production rate has to be revisited - as does the size of the production facilities and engineering manning levels.
That introduces several problems. The time and cost of building new/larger production facilities; ensuring subcontractors are able to do the same to ensure no bottlenecks - and assurances they'll get future orders at the same rate to justify/calculate their costs and prices; recruiting, security clearing and training the new staff such as exotic welders (which means pulling the experienced current workers off the line to become instructors) plus the RN recruiting and training the officers and men to crew them.
That's assuming the Treasury is actually able/willing to foot the bills when the full costs become apparent.....

Joined: Apr 2006
Posts: 813
Likes: 429
From: Portsmouth
You really don't have to "explain" any of that to me. It may just relate to my day job......
The debacle of the post T/V boat skills shortage hit the design element first, then the production. Which is why Barrow ended up building some surface ships and a couple of commercial tankers in the late nineties / early noughties just to pay the bills. Now they have a continuous stream of production work, that side will take care of itself to a degree. What is less obvious is the design cycle, particularly for the initial stages, which for AUKUS has been going on for quite a while now. One of the reasons to decrease the build time will be to potentially decrease the interval between design times as well.
I did say it won't be easy - but that's also why the overall arguments on numbers vs capacity need looking at. One of the other consequences of long build durations is that much of the kit is legacy by the time the boat gets into service. That makes the support function even harder.
However - given the squirming over the actual budget trajectory I doubt Starmer has any answers. This is a kick the can down the road budget.
The debacle of the post T/V boat skills shortage hit the design element first, then the production. Which is why Barrow ended up building some surface ships and a couple of commercial tankers in the late nineties / early noughties just to pay the bills. Now they have a continuous stream of production work, that side will take care of itself to a degree. What is less obvious is the design cycle, particularly for the initial stages, which for AUKUS has been going on for quite a while now. One of the reasons to decrease the build time will be to potentially decrease the interval between design times as well.
I did say it won't be easy - but that's also why the overall arguments on numbers vs capacity need looking at. One of the other consequences of long build durations is that much of the kit is legacy by the time the boat gets into service. That makes the support function even harder.
However - given the squirming over the actual budget trajectory I doubt Starmer has any answers. This is a kick the can down the road budget.

Joined: Apr 2020
Posts: 1,980
Likes: 376
From: Hampshire
So assuminglate 30s Agammemnon and Achilles will be decommissioned less than 15 years after commissioning. For the Trafalgars all lasted 25-30+ years, apart from Swiftsure herself (for specific reasons) the class all made it to 20+ years in commission before falling prey to defence cuts.
I am not au fait with modern SSN capabilities but with a 'littoral' focus for much of HM Naval Service shouldn't we be looking at SSKs as well? Yes, I know we would need to recruit and retrain to crew them.
I am not au fait with modern SSN capabilities but with a 'littoral' focus for much of HM Naval Service shouldn't we be looking at SSKs as well? Yes, I know we would need to recruit and retrain to crew them.
Last edited by SLXOwft; 2nd June 2025 at 16:04.

Joined: May 2009
Posts: 1,909
Likes: 129
From: Here
So assuminglate 30s Agammemnon and Achilles will be decommissioned less than 15 years after commissioning. For the Trafalgars all lasted 25-30+ years, apart from Swiftsure herself (for specific reasons) they all made it to 20+ years in commission before falling prey to defence cuts.

Joined: Apr 2006
Posts: 813
Likes: 429
From: Portsmouth

Joined: Dec 2001
Aviation Qualifications: Military
Posts: 2,983
Likes: 488
From: The Roman Empire
"...pivoting back to state on state open ocean...."
Against who, apart from China - and we're supposedly going to be NATO focused going forward.
A quick look at the current Russian surface fleet indicates that a lot of their ships, from cruisers down to corvettes, are 35 years old or older. They also have 4 geographically quite separate fleets to resource.
I don't know what Russian intentions are with regard to budget and building plans for their navy, but it appears to be withering on the vine from a search of publicly available sources.
Standing by to be corrected/educated!
Against who, apart from China - and we're supposedly going to be NATO focused going forward.
A quick look at the current Russian surface fleet indicates that a lot of their ships, from cruisers down to corvettes, are 35 years old or older. They also have 4 geographically quite separate fleets to resource.
I don't know what Russian intentions are with regard to budget and building plans for their navy, but it appears to be withering on the vine from a search of publicly available sources.
Standing by to be corrected/educated!
Thread Starter
Ecce Homo! Loquitur...

Joined: Jul 2000
Aviation Qualifications: Spotter
Posts: 24,637
Likes: 7,338
From: Peripatetic
A quick look at the current Russian surface fleet indicates that a lot of their ships, from cruisers down to corvettes, are 35 years old or older. They also have 4 geographically quite separate fleets to resource.
https://www.nti.org/analysis/article...-capabilities/

Joined: Dec 2001
Aviation Qualifications: Military
Posts: 2,983
Likes: 488
From: The Roman Empire
I don't want to get into a p*#@ing contest over this but their nuclear submarine fleet would appear to include:
5 Delta IVs - 41 to 35 years old
7 Oscars IIs - 37 to 29 years old
2 Victors IIIs - 35 to 33 years old
2 Sierra IIs - 35 to 32 years old
9 Akulas - 35 to 25 years old (8 out of 9 over 30)
That's an awful lot of hulls nearing the end of their life and in need of replacement.
Older submarines are also noisier submarines, which makes them easier to locate and kill.
There are also increased safety issues, but perhaps the Russian Navy is willing to accept more risk in that area than western counterparts.
5 Delta IVs - 41 to 35 years old
7 Oscars IIs - 37 to 29 years old
2 Victors IIIs - 35 to 33 years old
2 Sierra IIs - 35 to 32 years old
9 Akulas - 35 to 25 years old (8 out of 9 over 30)
That's an awful lot of hulls nearing the end of their life and in need of replacement.
Older submarines are also noisier submarines, which makes them easier to locate and kill.
There are also increased safety issues, but perhaps the Russian Navy is willing to accept more risk in that area than western counterparts.
Last edited by Biggus; 2nd June 2025 at 18:23.


Joined: Oct 2018
Aviation Qualifications: PPL
Posts: 12,245
Likes: 1,657
From: Ferrara
"I'm far from convinced that the "Littoral" is the focus anymore. We appear to be pivoting back to state on state open ocean,"
I suspect part of it is that the Littoral is likely to be a rather dangerous place these days - people look at the Moskva, and the drones pouring out of Yemen - you don't want expensive hardware too close in
I suspect part of it is that the Littoral is likely to be a rather dangerous place these days - people look at the Moskva, and the drones pouring out of Yemen - you don't want expensive hardware too close in

Joined: Apr 2020
Posts: 1,980
Likes: 376
From: Hampshire


Joined: Apr 2020
Posts: 1,980
Likes: 376
From: Hampshire
I'm far from convinced that the "Littoral" is the focus anymore. We appear to be pivoting back to state on state open ocean, as opposed to visiting the peace-loving natives of Umbhoto Gorge. Trouble with SSK is that they're essentially immobile. Great for homeland defence / sea denial, not so good for worldwide ops (compared to SSN).
Amphibious Advance Force operations remain a critical focus for the Royal Marines Commando Force, operating in some of the most extreme environments and offering political choice for action worldwide. These operations should increasingly focus on supporting NATO requirements, including integrating into the UK-led Strategic Reserve Corps when appropriate (Chapter 7.3) - p106
Role 2: Deter and defend in the Euro-Atlantic: contributing to NATO Regional Plans through the provision of: CASD; fifth-generation carrier strike capability; anti-submarine warfare, with a focus on securing the North Atlantic through its Atlantic Bastion plan (Box 12); littoral strike; and Type 45 destroyers providing Integrated Air and Missile Defence (Chapter 7.4). - p105
Role 2: Deter and defend in the Euro-Atlantic: contributing to NATO Regional Plans through the provision of: CASD; fifth-generation carrier strike capability; anti-submarine warfare, with a focus on securing the North Atlantic through its Atlantic Bastion plan (Box 12); littoral strike; and Type 45 destroyers providing Integrated Air and Missile Defence (Chapter 7.4). - p105

Joined: Apr 2006
Posts: 813
Likes: 429
From: Portsmouth
I am trying to digest the following, does it mean FCF is being ditched as gash and the Royals are going to be heavily integrated into The Army, littoral strike gets a passing mention on page 105 but LRG(N) looks to me like it is a much diminished version of COMAW's units including 3 Cdo Bde declared to reinforce the Northern Flank when I joined. I suspect LRG(S) will cease to exist in fact if not on paper.
As long as it doesn't cost any money. Interestingly, not a mention of MRSS in that steaming pile of ordure......
Thread Starter
Ecce Homo! Loquitur...

Joined: Jul 2000
Aviation Qualifications: Spotter
Posts: 24,637
Likes: 7,338
From: Peripatetic
The Astute PWR Core H reactor has a design life of 30 years, so it will reach the planned out of service date around 2037.
But reactor life isn’t a finite hard cut off - it just means power starts to degrade - HMS Trenchant had a planned reactor life of 25 years and was finally decommissioned after 36 years (1986-1922).
So, assuming the first SSN-A is laid down in 2030, and is launched around 2040, Astute should reasonably be expected to last until she is commissioned.
But reactor life isn’t a finite hard cut off - it just means power starts to degrade - HMS Trenchant had a planned reactor life of 25 years and was finally decommissioned after 36 years (1986-1922).
So, assuming the first SSN-A is laid down in 2030, and is launched around 2040, Astute should reasonably be expected to last until she is commissioned.

Joined: Nov 2007
Posts: 506
Likes: 93
From: UK
Also worth remembering that the average time between the delivery of each Astute has been a lot more than 18 months. So if Astute herself can survive until the first AUKUS boat commissions, the remaining Astutes will be relatively youthful and an 18 month interval between delivery of subsequent boats shouldn't be a problem at all - in fact beyond a certain point it should allow overall numbers to creep up...

Joined: Apr 2006
Posts: 813
Likes: 429
From: Portsmouth
The Astute PWR Core H reactor has a design life of 30 years, so it will reach the planned out of service date around 2037.
But reactor life isn’t a finite hard cut off - it just means power starts to degrade - HMS Trenchant had a planned reactor life of 25 years and was finally decommissioned after 36 years (1986-1922).
So, assuming the first SSN-A is laid down in 2030, and is launched around 2040, Astute should reasonably be expected to last until she is commissioned.
But reactor life isn’t a finite hard cut off - it just means power starts to degrade - HMS Trenchant had a planned reactor life of 25 years and was finally decommissioned after 36 years (1986-1922).
So, assuming the first SSN-A is laid down in 2030, and is launched around 2040, Astute should reasonably be expected to last until she is commissioned.


Joined: Oct 2018
Aviation Qualifications: PPL
Posts: 12,245
Likes: 1,657
From: Ferrara
"So if Astute herself can survive until the first AUKUS boat commissions, the remaining Astutes will be relatively youthful and an 18 month interval between delivery of subsequent boats shouldn't be a problem at all -"
Yes - the Trafalgars started to decommission end 2009 and 16 years later there's still one in service. The first Astute commissioned in 2010 and there are still two to come so you can expect significant overlap for many years with SSN-A
Yes - the Trafalgars started to decommission end 2009 and 16 years later there's still one in service. The first Astute commissioned in 2010 and there are still two to come so you can expect significant overlap for many years with SSN-A



