Old 2nd June 2025 | 10:21
  #1761 (permalink)  
20 Anniversary
 
Joined: Dec 2001
Aviation Qualifications: Military
Posts: 2,986
Likes: 492
From: The Roman Empire
Build submarines in 18 months.

Build 1.5 million new homes by 2030

Achieve 95% clean energy by 2030

Labour politicians (and probably ALL politicians) never let practical realities get in the way of their promises/pledges/commitments, which are often timed far enough for delivery in the future that they know they'll have moved on and not be held responsible for failure.
Biggus is online now  
Reply
Old 2nd June 2025 | 10:23
  #1762 (permalink)  
20 Anniversary
 
Joined: Apr 2006
Posts: 814
Likes: 429
From: Portsmouth
That's what you get with placemen pollies. they don't understand their briefing notes.

I suspect what he meant was interval between deliveries, as opposed to total production time. It is clearly madness to suggest that - particularly the way BAES operates - one could build a boat in 18 months. On the other hand, it is also madness to continue building boats such that it takes twelve years between cutting steel and going on sea trials.

It won't be easy, but it has to be done. Ir also means the arguments about build capacity vs number of boats will need revisiting.

Not_a_boffin is online now  
Reply
Old 2nd June 2025 | 10:53
  #1763 (permalink)  
Thread Starter
Ecce Homo! Loquitur...
Community Influencer
 
Joined: Jul 2000
Aviation Qualifications: Spotter
Posts: 24,645
Likes: 7,343
From: Peripatetic
On the other hand, it is also madness to continue building boats such that it takes twelve years between cutting steel and going on sea trials.
As explained here previously the production rate is designed not to build subs quickly or most economically but, (post the debacle caused by the hiatus between Trafagar/Valiant when most design and experienced construction staff retired or were laid off), to ensure a low production rate in order to keep the teams together until the next class was required.

Now, especially at RR who now have to increase their production rate to accommodate the Australian SSN-A reactor modules as well as RN orders, that production rate has to be revisited - as does the size of the production facilities and engineering manning levels.

That introduces several problems. The time and cost of building new/larger production facilities; ensuring subcontractors are able to do the same to ensure no bottlenecks - and assurances they'll get future orders at the same rate to justify/calculate their costs and prices; recruiting, security clearing and training the new staff such as exotic welders (which means pulling the experienced current workers off the line to become instructors) plus the RN recruiting and training the officers and men to crew them.

​​​​​​​That's assuming the Treasury is actually able/willing to foot the bills when the full costs become apparent.....
ORAC is online now  
Reply
Old 2nd June 2025 | 11:24
  #1764 (permalink)  
20 Anniversary
 
Joined: Apr 2006
Posts: 814
Likes: 429
From: Portsmouth
You really don't have to "explain" any of that to me. It may just relate to my day job......

The debacle of the post T/V boat skills shortage hit the design element first, then the production. Which is why Barrow ended up building some surface ships and a couple of commercial tankers in the late nineties / early noughties just to pay the bills. Now they have a continuous stream of production work, that side will take care of itself to a degree. What is less obvious is the design cycle, particularly for the initial stages, which for AUKUS has been going on for quite a while now. One of the reasons to decrease the build time will be to potentially decrease the interval between design times as well.

I did say it won't be easy - but that's also why the overall arguments on numbers vs capacity need looking at. One of the other consequences of long build durations is that much of the kit is legacy by the time the boat gets into service. That makes the support function even harder.

However - given the squirming over the actual budget trajectory I doubt Starmer has any answers. This is a kick the can down the road budget.
Not_a_boffin is online now  
Reply
Old 2nd June 2025 | 15:29
  #1765 (permalink)  
5 Anniversary
 
Joined: Apr 2020
Posts: 1,982
Likes: 378
From: Hampshire
So assuminglate 30s Agammemnon and Achilles will be decommissioned less than 15 years after commissioning. For the Trafalgars all lasted 25-30+ years, apart from Swiftsure herself (for specific reasons) the class all made it to 20+ years in commission before falling prey to defence cuts.

I am not au fait with modern SSN capabilities but with a 'littoral' focus for much of HM Naval Service shouldn't we be looking at SSKs as well? Yes, I know we would need to recruit and retrain to crew them.

Last edited by SLXOwft; 2nd June 2025 at 16:04.
SLXOwft is online now  
Reply
Old 2nd June 2025 | 15:45
  #1766 (permalink)  
15 Anniversary
 
Joined: May 2009
Posts: 1,909
Likes: 129
From: Here
Originally Posted by SLXOwft
So assuminglate 30s Agammemnon and Achilles will be decommissioned less than 15 years after commissioning. For the Trafalgars all lasted 25-30+ years, apart from Swiftsure herself (for specific reasons) they all made it to 20+ years in commission before falling prey to defence cuts.
Assuming delivery of the first successor SSN will be late 30s - even if they do get 18 months between deliveries, and all 12 boats, then you are looking at an 18 year build program, so the later Astutes may be in service into the 2050s
Davef68 is offline  
Reply
Old 2nd June 2025 | 15:53
  #1767 (permalink)  
20 Anniversary
 
Joined: Apr 2006
Posts: 814
Likes: 429
From: Portsmouth
Originally Posted by SLXOwft

I am not au fait with modern SSN capabilities but with a 'littoral' focus for much of HM Naval Service shouldn't we be looking at SSKs as well? Yes, I know we would need to recruit and retrain to crew them.
I'm far from convinced that the "Littoral" is the focus anymore. We appear to be pivoting back to state on state open ocean, as opposed to visiting the peace-loving natives of Umbhoto Gorge. Trouble with SSK is that they're essentially immobile. Great for homeland defence / sea denial, not so good for worldwide ops (compared to SSN).
Not_a_boffin is online now  
Reply
Old 2nd June 2025 | 17:07
  #1768 (permalink)  
20 Anniversary
 
Joined: Dec 2001
Aviation Qualifications: Military
Posts: 2,986
Likes: 492
From: The Roman Empire
"...pivoting back to state on state open ocean...."

Against who, apart from China - and we're supposedly going to be NATO focused going forward.

A quick look at the current Russian surface fleet indicates that a lot of their ships, from cruisers down to corvettes, are 35 years old or older. They also have 4 geographically quite separate fleets to resource.

I don't know what Russian intentions are with regard to budget and building plans for their navy, but it appears to be withering on the vine from a search of publicly available sources.

Standing by to be corrected/educated!
Biggus is online now  
Reply
Old 2nd June 2025 | 17:39
  #1769 (permalink)  
Thread Starter
Ecce Homo! Loquitur...
Community Influencer
 
Joined: Jul 2000
Aviation Qualifications: Spotter
Posts: 24,645
Likes: 7,343
From: Peripatetic
A quick look at the current Russian surface fleet indicates that a lot of their ships, from cruisers down to corvettes, are 35 years old or older. They also have 4 geographically quite separate fleets to resource.
But they have a sizeable nuclear submarine fleet which they are in the process of upgrading and/or replacing.

​​​​​​​https://www.nti.org/analysis/article...-capabilities/
ORAC is online now  
Reply
Old 2nd June 2025 | 18:13
  #1770 (permalink)  
20 Anniversary
 
Joined: Dec 2001
Aviation Qualifications: Military
Posts: 2,986
Likes: 492
From: The Roman Empire
I don't want to get into a p*#@ing contest over this but their nuclear submarine fleet would appear to include:

5 Delta IVs - 41 to 35 years old
7 Oscars IIs - 37 to 29 years old
2 Victors IIIs - 35 to 33 years old
2 Sierra IIs - 35 to 32 years old
9 Akulas - 35 to 25 years old (8 out of 9 over 30)

That's an awful lot of hulls nearing the end of their life and in need of replacement.

Older submarines are also noisier submarines, which makes them easier to locate and kill.

There are also increased safety issues, but perhaps the Russian Navy is willing to accept more risk in that area than western counterparts.

Last edited by Biggus; 2nd June 2025 at 18:23.
Biggus is online now  
Reply
Old 3rd June 2025 | 07:54
  #1771 (permalink)  
Community Builder
Community Influencer
 
Joined: Oct 2018
Aviation Qualifications: PPL
Posts: 12,247
Likes: 1,658
From: Ferrara
"I'm far from convinced that the "Littoral" is the focus anymore. We appear to be pivoting back to state on state open ocean,"

I suspect part of it is that the Littoral is likely to be a rather dangerous place these days - people look at the Moskva, and the drones pouring out of Yemen - you don't want expensive hardware too close in
Asturias56 is offline  
Reply
Old 3rd June 2025 | 12:01
  #1772 (permalink)  
5 Anniversary
 
Joined: Apr 2020
Posts: 1,982
Likes: 378
From: Hampshire
Originally Posted by Davef68
Assuming delivery of the first successor SSN will be late 30s - even if they do get 18 months between deliveries, and all 12 boats, then you are looking at an 18 year build program, so the later Astutes may be in service into the 2050s
Silly me, the version of the story implied (later corrected) delivery would be through the 30s - it did seem wildly optismistic. So we actually actually have the opposite problem, the 25 year life of the reactors that implies given launching in 2007 and commissioning in 2010 Astute needs replacing in commission sometime in the early 2030s ( and Ambush in the years before before 2036) or the fleet will be shrinking. Unless of course the unrefueled life of the PWR2 can be extended

SLXOwft is online now  
Reply
Old 3rd June 2025 | 12:24
  #1773 (permalink)  
5 Anniversary
 
Joined: Apr 2020
Posts: 1,982
Likes: 378
From: Hampshire
Originally Posted by Not_a_boffin
I'm far from convinced that the "Littoral" is the focus anymore. We appear to be pivoting back to state on state open ocean, as opposed to visiting the peace-loving natives of Umbhoto Gorge. Trouble with SSK is that they're essentially immobile. Great for homeland defence / sea denial, not so good for worldwide ops (compared to SSN).
I am trying to digest the following, does it mean FCF is being ditched as gash and the Royals are going to be heavily integrated into The Army, littoral strike gets a passing mention on page 105 but LRG(N) looks to me like it is a much diminished version of COMAW's units including 3 Cdo Bde declared to reinforce the Northern Flank when I joined. I suspect LRG(S) will cease to exist in fact if not on paper.

Amphibious Advance Force operations remain a critical focus for the Royal Marines Commando Force, operating in some of the most extreme environments and offering political choice for action worldwide. These operations should increasingly focus on supporting NATO requirements, including integrating into the UK-led Strategic Reserve Corps when appropriate (Chapter 7.3) - p106

Role 2: Deter and defend in the Euro-Atlantic: contributing to NATO Regional Plans through the provision of: CASD; fifth-generation carrier strike capability; anti-submarine warfare, with a focus on securing the North Atlantic through its Atlantic Bastion plan (Box 12); littoral strike; and Type 45 destroyers providing Integrated Air and Missile Defence (Chapter 7.4). - p105
SLXOwft is online now  
Reply
Old 3rd June 2025 | 12:35
  #1774 (permalink)  
20 Anniversary
 
Joined: Apr 2006
Posts: 814
Likes: 429
From: Portsmouth
Originally Posted by SLXOwft
I am trying to digest the following, does it mean FCF is being ditched as gash and the Royals are going to be heavily integrated into The Army, littoral strike gets a passing mention on page 105 but LRG(N) looks to me like it is a much diminished version of COMAW's units including 3 Cdo Bde declared to reinforce the Northern Flank when I joined. I suspect LRG(S) will cease to exist in fact if not on paper.
I suspect that FCF will survive in some form, largely because 3 Cdo ceased to exist as a formed unit some time ago - which was why people were relatively relaxed about the LPDs going.

As long as it doesn't cost any money. Interestingly, not a mention of MRSS in that steaming pile of ordure......
Not_a_boffin is online now  
Reply
Old 3rd June 2025 | 12:36
  #1775 (permalink)  
Thread Starter
Ecce Homo! Loquitur...
Community Influencer
 
Joined: Jul 2000
Aviation Qualifications: Spotter
Posts: 24,645
Likes: 7,343
From: Peripatetic
The Astute PWR Core H reactor has a design life of 30 years, so it will reach the planned out of service date around 2037.

But reactor life isn’t a finite hard cut off - it just means power starts to degrade - HMS Trenchant had a planned reactor life of 25 years and was finally decommissioned after 36 years (1986-1922).

So, assuming the first SSN-A is laid down in 2030, and is launched around 2040, Astute should reasonably be expected to last until she is commissioned.
ORAC is online now  
Reply
Old 3rd June 2025 | 14:01
  #1776 (permalink)  
15 Anniversary
 
Joined: Nov 2007
Posts: 507
Likes: 93
From: UK
Also worth remembering that the average time between the delivery of each Astute has been a lot more than 18 months. So if Astute herself can survive until the first AUKUS boat commissions, the remaining Astutes will be relatively youthful and an 18 month interval between delivery of subsequent boats shouldn't be a problem at all - in fact beyond a certain point it should allow overall numbers to creep up...
Frostchamber is online now  
Reply
Old 3rd June 2025 | 14:29
  #1777 (permalink)  
20 Anniversary
 
Joined: Dec 2001
Aviation Qualifications: Military
Posts: 2,986
Likes: 492
From: The Roman Empire
.....apart from the fact that boats WON'T be delivered at 18 month intervals.
Biggus is online now  
Reply
Old 3rd June 2025 | 15:17
  #1778 (permalink)  
15 Anniversary
 
Joined: Nov 2007
Posts: 507
Likes: 93
From: UK
Probably true. In which case they just need to be delivered more regularly than the Astutes have been. If we can't manage that, we might as well pack up and go home.
Frostchamber is online now  
Reply
Old 3rd June 2025 | 15:39
  #1779 (permalink)  
20 Anniversary
 
Joined: Apr 2006
Posts: 814
Likes: 429
From: Portsmouth
Originally Posted by ORAC
The Astute PWR Core H reactor has a design life of 30 years, so it will reach the planned out of service date around 2037.

But reactor life isn’t a finite hard cut off - it just means power starts to degrade - HMS Trenchant had a planned reactor life of 25 years and was finally decommissioned after 36 years (1986-1922).

So, assuming the first SSN-A is laid down in 2030, and is launched around 2040, Astute should reasonably be expected to last until she is commissioned.
The T-boats were designed to be refuelled mid-life - and were. A-boats are not so designed. Pain, grief and suffering.......
Not_a_boffin is online now  
Reply
Old 3rd June 2025 | 15:59
  #1780 (permalink)  
Community Builder
Community Influencer
 
Joined: Oct 2018
Aviation Qualifications: PPL
Posts: 12,247
Likes: 1,658
From: Ferrara
"So if Astute herself can survive until the first AUKUS boat commissions, the remaining Astutes will be relatively youthful and an 18 month interval between delivery of subsequent boats shouldn't be a problem at all -"

Yes - the Trafalgars started to decommission end 2009 and 16 years later there's still one in service. The first Astute commissioned in 2010 and there are still two to come so you can expect significant overlap for many years with SSN-A
Asturias56 is offline  
Reply