Old 19th Jul 2022, 00:20
  #961 (permalink)  
 
Join Date: Oct 2007
Location: A better place.
Posts: 2,319
Received 24 Likes on 16 Posts
My thoughts exactly... he should stick to speaking about soldiering.
There's only one boat Australia should get in my view... and it ain't the Astute.
tartare is offline  
Old 20th Jul 2022, 19:55
  #962 (permalink)  
Ecce Homo! Loquitur...
Thread Starter
 
Join Date: Jul 2000
Location: Peripatetic
Posts: 17,476
Received 1,627 Likes on 744 Posts
"The prospect of British submarines being based out of Perth with Australian sailors on board to undergo nuclear training will be advanced, with the head of the UK military to hold top-level talks with Australian officials next week."

https://www.afr.com/politics/federal...0220720-p5b36w

Military chiefs to hold talks on basing UK nuclear submarines in Perth
ORAC is offline  
Old 20th Jul 2022, 23:00
  #963 (permalink)  
 
Join Date: Oct 2007
Location: A better place.
Posts: 2,319
Received 24 Likes on 16 Posts
Yep - not surprised by that.
I suspect you'll see both British and American boats moving through Perth on a regular basis from now on.
Interesting backgrounder here on the similarities/differences between the two boats.
https://www.aspistrategist.org.au/as...for-australia/
Payload and combat system a significant tick for the Virginia class I would argue.
And that said - noting there'll be no capacity for Britain to build any Australian boats in the near future, this report makes for sobering reading on the US ability to even supply it's own needs:
https://crsreports.congress.gov/product/pdf/RL/RL32418

Last edited by tartare; 20th Jul 2022 at 23:34.
tartare is offline  
Old 21st Jul 2022, 22:47
  #964 (permalink)  
 
Join Date: Jul 2008
Location: Australia OZ
Age: 75
Posts: 2,587
Likes: 0
Received 53 Likes on 46 Posts
Another 22 Jul 2022 report:
https://www.msn.com/en-au/news/australia/fleet-of-nuclear-submarines-will-be-sent-by-britain-to-australia-as-a-warning-to-china/ar-AAZPBMG
"...Last night the MoD said: ‘It is UK policy that we do not comment on matters relating to submarine activity or operations.’"
SpazSinbad is offline  
Old 22nd Jul 2022, 00:27
  #965 (permalink)  
 
Join Date: Dec 2017
Location: australia
Posts: 397
Received 29 Likes on 18 Posts
Originally Posted by tartare
Yep - not surprised by that.
I suspect you'll see both British and American boats moving through Perth on a regular basis from now on.
Interesting backgrounder here on the similarities/differences between the two boats.
https://www.aspistrategist.org.au/as...for-australia/
Payload and combat system a significant tick for the Virginia class I would argue.
And that said - noting there'll be no capacity for Britain to build any Australian boats in the near future, this report makes for sobering reading on the US ability to even supply it's own needs:
https://crsreports.congress.gov/product/pdf/RL/RL32418
If they get a firm ongoing order. The yard has said it can increase and build 3 Virginia's a year. Refer to Usni
golder is online now  
Old 22nd Jul 2022, 07:10
  #966 (permalink)  
 
Join Date: Oct 2018
Location: Ferrara
Posts: 8,505
Received 369 Likes on 216 Posts
"The yard has said it can increase and build 3 Virginia's a year. "

Well of course they have - but CAN they ? over the last 30 years getting vessels of any type out of any yard anywhere on time and cost has been a bit fraught. And all the N sub makers have had serious issues.

The fastest way for the RAN is to takeover some early Virginias on lease -that will minimise impact on the USN and allow the RAN to get up to speed with the very different operating environment of an SSN
Asturias56 is offline  
Old 22nd Jul 2022, 09:54
  #967 (permalink)  
 
Join Date: Jun 2001
Location: Wherever I can log on.
Posts: 1,872
Received 10 Likes on 7 Posts
Originally Posted by golder
If they get a firm ongoing order. The yard has said it can increase and build 3 Virginia's a year. Refer to Usni
That’s not what they are telling Congress, the fact that construction of the Columbia class SSBN has absolute priority over every other military program has meant that most of the skilled workers at GDEB & HII have been moved onto that program so the completion and delivery of new Virginia SSN’s has been adversely affected with significant delays being experienced, especially with the Block 5 boats. They are currently unable to deliver 2 Virginia’s per annum as they can’t find sufficient staff and get them trained to a competent level.

It also indicates that they will struggle to release skilled managers to loan to ASC for the construction at Osborne.

As far as getting RAN personnel up to speed on Nukes, I suspect that the USN may end up home porting 2 Virginia’s at Fleet Base West. These vessels would be manned with experienced USN trainers and RAN submariners and would be deployed on normal USN missions. In this way, the USN would retain their critically needed submarines but assist the RAN in getting sufficient submariners trained before the ASC built vessels enter service. This obviously assumes that the RAN & Government choose the Virginia over the Astute.
Going Boeing is offline  
Old 22nd Jul 2022, 10:24
  #968 (permalink)  
 
Join Date: Apr 2011
Location: aus
Posts: 1,318
Likes: 0
Received 111 Likes on 69 Posts
Originally Posted by Going Boeing
That’s not what they are telling Congress, the fact that construction of the Columbia class SSBN has absolute priority over every other military program has meant that most of the skilled workers at GDEB & HII have been moved onto that program so the completion and delivery of new Virginia SSN’s has been adversely affected with significant delays being experienced, especially with the Block 5 boats. They are currently unable to deliver 2 Virginia’s per annum as they can’t find sufficient staff and get them trained to a competent level.

It also indicates that they will struggle to release skilled managers to loan to ASC for the construction at Osborne.

As far as getting RAN personnel up to speed on Nukes, I suspect that the USN may end up home porting 2 Virginia’s at Fleet Base West. These vessels would be manned with experienced USN trainers and RAN submariners and would be deployed on normal USN missions. In this way, the USN would retain their critically needed submarines but assist the RAN in getting sufficient submariners trained before the ASC built vessels enter service. This obviously assumes that the RAN & Government choose the Virginia over the Astute.

I pretty much agree with what you said, a somewhat interesting side note. I have a friend who applied for and looks to have a been successful (accepted by previous govt but not yet confirmed by new govt) for the 20K grant to study nuclear engineering. He seems to believe that Australians will mostly be going to the UK nuclear engineering school as they have more spare capacity than the american school does atm. Also most of the sub officers goto either british or dutch perisher
rattman is offline  
Old 22nd Jul 2022, 10:37
  #969 (permalink)  
 
Join Date: Nov 2018
Location: back out to Grasse
Posts: 557
Received 28 Likes on 12 Posts
If it were only about the boat, this decision would be a no-brainer.

But it is not. Perhaps this article has been fielded before, but it gives an idea of the magnitude of the decision.

Virginia vs Astute

IG
Imagegear is offline  
Old 22nd Jul 2022, 13:12
  #970 (permalink)  
 
Join Date: Dec 2017
Location: australia
Posts: 397
Received 29 Likes on 18 Posts
Originally Posted by Going Boeing
That’s not what they are telling Congress, the fact that construction of the Columbia class SSBN has absolute priority over every other military program has meant that most of the skilled workers at GDEB & HII have been moved onto that program so the completion and delivery of new Virginia SSN’s has been adversely affected with significant delays being experienced, especially with the Block 5 boats. They are currently unable to deliver 2 Virginia’s per annum as they can’t find sufficient staff and get them trained to a competent level.
A lot is how they talk to congress. they do the same with the F-35.They do say they can ramp up to 3
https://news.usni.org/2020/11/18/nav...pyard-capacity
The Navy has “full confidence we can ramp up” to building three attack submarines per year if the Navy buildup proposed by former Defense Secretary Mark Esper were to be enacted, despite ongoing delays in Block IV Virginia-class construction, the program executive officer for submarines said today.

Last edited by golder; 22nd Jul 2022 at 14:11.
golder is online now  
Old 22nd Jul 2022, 16:25
  #971 (permalink)  
Ecce Homo! Loquitur...
Thread Starter
 
Join Date: Jul 2000
Location: Peripatetic
Posts: 17,476
Received 1,627 Likes on 744 Posts
Contractors always swear they can perform up to the moment the contract is signed - then the delays are always factors outside their control, especially the inevitable contract changes…
ORAC is offline  
Old 22nd Jul 2022, 22:58
  #972 (permalink)  
 
Join Date: Dec 2017
Location: australia
Posts: 397
Received 29 Likes on 18 Posts
It is the USN and Defense Secretary Mark Esper saying it. The contractor wants a firm order before they spend their money on infrastructure
golder is online now  
Old 23rd Jul 2022, 07:45
  #973 (permalink)  
 
Join Date: Oct 2018
Location: Ferrara
Posts: 8,505
Received 369 Likes on 216 Posts
That's what they say but "despite ongoing delays in Block IV Virginia-class construction, " shows there is still a problem with current build rates.

As I've said NO country is able to deliver SSN/'s and SSBN's on time - they are extremely complex bits of kit
Asturias56 is offline  
Old 23rd Jul 2022, 08:07
  #974 (permalink)  
 
Join Date: Apr 2011
Location: aus
Posts: 1,318
Likes: 0
Received 111 Likes on 69 Posts
Originally Posted by Asturias56
That's what they say but "despite ongoing delays in Block IV Virginia-class construction, " shows there is still a problem with current build rates.

As I've said NO country is able to deliver SSN/'s and SSBN's on time - they are extremely complex bits of kit
Pretty sure all the early virginia's were on time, or close enough for government work. They block V's have been delayed but all the a earlier blocks have been near enough to on schedule. The block V are having issues because of covid and being ordered to a prioritise the columbia class
rattman is offline  
Old 23rd Jul 2022, 08:30
  #975 (permalink)  
 
Join Date: Dec 2017
Location: australia
Posts: 397
Received 29 Likes on 18 Posts
Part of the reason is that some lifetime parts aren't lasting a lifetime. They were stolen from current build and they are now delayed till the new replacement parts come.
golder is online now  
Old 23rd Jul 2022, 20:16
  #976 (permalink)  
 
Join Date: Dec 2021
Location: Noumea
Posts: 28
Likes: 0
Received 0 Likes on 0 Posts
Aussies will never get nuclear subs - painful, but so obvious.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
JeanKhul is offline  
Old 23rd Jul 2022, 21:15
  #977 (permalink)  
 
Join Date: Dec 2000
Location: Northumberland, England
Posts: 280
Received 34 Likes on 5 Posts
Originally Posted by JeanKhul
Aussies will never get nuclear subs - painful, but so obvious.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
French grapes are so sour...
Tocsin is offline  
Old 23rd Jul 2022, 21:58
  #978 (permalink)  
 
Join Date: Jul 2017
Location: Canberra
Posts: 39
Likes: 0
Received 2 Likes on 2 Posts
Originally Posted by JeanKhul
Aussies will never get nuclear subs - painful, but so obvious.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
Get out of le bed on the wrong side did we?
HK144 is offline  
Old 23rd Jul 2022, 23:32
  #979 (permalink)  

Evertonian
 
Join Date: May 2000
Location: #3117# Ppruner of the Year Nominee 2005
Posts: 12,509
Received 106 Likes on 60 Posts
Originally Posted by JeanKhul
Aussies will never get nuclear subs - painful, but so obvious.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
Better than a White one.
Buster Hyman is offline  
Old 23rd Jul 2022, 23:46
  #980 (permalink)  
 
Join Date: Oct 2009
Location: Land of Oz
Posts: 565
Received 9 Likes on 5 Posts
Originally Posted by JeanKhul
Aussies will never get nuclear subs - painful, but so obvious.
The only thing they can dream about, would be leasing some UK our US subs - or asking them to stop from time to time in Darwin or Perth - and put a RAN flag on top, for the duration of the stopover. Maximum.
Unfortunately, I may agree with our Froggie mate here.
With a Labor Govt in now (who never really want to talk nuke), and with our appalling and delayed procurement process, and the limited SSN supply pool, and the virtual lack of an AUS nuke industry and knowledge, nuke subs are not only a way off - but also delays will likely lead to a lack of interest as the project falls by the wayside.
But there is much benefit in ongoing AUKUS 3-eyes common procurement (of airframes for instance), intel, basing, networking, policy, procedures, exercises, operations, and dialog.
BBadanov is offline  