New Bell AD
Thread Starter
Join Date: Sep 2000
Location: states
Age: 68
Posts: 160
Likes: 0
Received 0 Likes
on
0 Posts
New Bell AD
http://www.airweb.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/fc69328b63b304498625757c00706b56/$FILE/2009-07-51_Emergency.pdf
http://www.bellcustomer.com/files/St...206-09-121.pdf
http://www.bellcustomer.com/files/St...06L-09-155.pdf
http://www.bellcustomer.com/files/St..._407-09-85.pdf
http://www.bellcustomer.com/files/St..._427-09-23.pdf
http://www.bellcustomer.com/files/St...206-09-121.pdf
http://www.bellcustomer.com/files/St...06L-09-155.pdf
http://www.bellcustomer.com/files/St..._407-09-85.pdf
http://www.bellcustomer.com/files/St..._427-09-23.pdf
Guest
Posts: n/a
Interestingly, the Bell ASB states:
"Before next flight, inspect all spare and installed
lever assemblies which have accumulated less than
50 hours in service."
Yet the FAA has insisted that ALL 206's (et al) are inspected before further flight. I had to get an engineer out to my place to get it done. PITA.
Why have the FAA taken their decision to exceed the Bell advice?
"Before next flight, inspect all spare and installed
lever assemblies which have accumulated less than
50 hours in service."
Yet the FAA has insisted that ALL 206's (et al) are inspected before further flight. I had to get an engineer out to my place to get it done. PITA.
Why have the FAA taken their decision to exceed the Bell advice?
Last edited by 206 jock; 19th Mar 2009 at 13:05.
I would question why only those assemblies with under 50 Hours being inspected. As a good engineering practice I would suggest inspecting every one of the things. At least they are calling for grounding the aircraft as it must be a critical problem should thing fail.
Also...a second question is it would seem Bell might not know which parts actually had those particular kinds of questionable bits installed except to a certain time period they were in the system during build of the parts. If that is so....then that is a bit troubling to me.
Also...a second question is it would seem Bell might not know which parts actually had those particular kinds of questionable bits installed except to a certain time period they were in the system during build of the parts. If that is so....then that is a bit troubling to me.
Join Date: Mar 2003
Location: the hills of halton
Age: 71
Posts: 809
Likes: 0
Received 0 Likes
on
0 Posts
This would suggest that this has been an ongoing problem , if the problem was only with a specific batch of parts I am sure that Bell would know exactly which aircraft were shipped with these batches and which ones were shipped as spares. It is inconceivable that an aerospace manufacturer would not have this information available through their ERP system. But on re reading the AD the TIS limit makes no sense , it would have made more sense to specify a range of serial numbers or spares delivered in a certain date range.
edited for spelling
edited for spelling