Japanese and other Asian military shipbuilders have the support and wherewithal to be entirely more efficient and productive than their UK counterpart?>...
Or they feel the need for haste in building defence somewhat more than we brother band. |
Two things
They settle on a design and then don't keep fiddling with it - their designs are also evolutionary and not revolutionary and they are willing to comprise and accept 90% of what they'd like to get on 100% of the ships delivered on time they build (and finance) at a steady tempo so the yards keep their skilled men, the managememnt aren't always on a learning curve and the manufacturing company isn't tempted to draw out building to prolong profits |
Azipod propulsion
Are the new carriers using a similar system of electric propulsion ? I ask as a large cruise liner using podded
propulsion has broken down near to where I am at the moment. Thanks, John |
John, no azipods, just two props at the back end...
-RP |
Carrier
Somehow I'm glad about that. The last (decent) ship I travelled
on had 12 cylinders about 101,000 hp. 25 knots +, 130,000 tons. |
|
Significant progress has been made on the jetty for the QEC:
Jetty completion marks major milestone in Carrier works Meanwhile I stumbled upon a qoute which seems apt giving the damage caused by political interference: Of all the public services, the Navy is the one in which tampering may be of the greatest danger, which can be worst supplied in an emergency, and of which failure draws after it the largest and heaviest train of consequences. Edmund Burke |
I suspect that jetty will be used an awful lot - as in "parking lot"........
|
I was amused to see a photo of a flight deck, complete with Harriers, in the Express' article with the caption:
HMS Ark Royal is Britain's only aircraft carrier |
Surely, in time of conflict, there would be significantly more F35s embarked on a QEC than in peace time - wouldn't that provide enough airframes for DCA as well as other tasks? After all, if you're not going to use these things in a hot war, when are you going to use them?
|
depends on the war I guess - and the total number of F-35's we acquire
|
Aircraft carrier delay warning from spending watchdog
By Jonathan Beale Defence correspondent, BBC News
HMS Queen Elizabeth and Prince Of Wales will provide the Navy with a capacity it will have been without for a decade. But the National Audit Office says the project is entering a "critical phase", with many risks to manage. The Ministry of Defence acknowledged "challenges" but said it was committed to being fully operational by 2026. The current cost estimates for both carriers, as well as the Lockheed Martin F-35B jets that will fly off them, is £14.3bn, the NAO said in its report. The NAO said technical problems means sea trials for the first carrier, HMS Queen Elizabeth, will not now take place until the summer - three months later than planned. It added that further technical issues could mean the carrier will not be operational by 2020, as has been promised by the MoD. Among the other areas mentioned by the NAO were:
A "significant proportion" of its fleet will be required to support and protect the ships, with a carrier task group likely to account for around 30% of the total fleet and 20% of the Navy's personnel. In a statement, the Ministry of Defence said it had the personnel needed for HMS Queen Elizabeth and plans for manning HMS Prince of Wales were "advanced". A spokesman added: "With sea trials expected to start in the summer, we recognise that there are challenges ahead and remain committed to delivering the full range of joint F-35 and carrier operations by 2026." |
there was also something in the Times today saying the MoD had only locked in their £ $ exchange rate until 2018........
|
....Pilots for the new F-35B jets need four years fast jet training with an additional nine-month carrier conversion course..... Sorry, I can't open the report on this computer, but is that 9 months for B conversion assuming prior fast jet experience, or really 9 months dedicated for "carrier conversion"? I don't think our friend Mogwi and certain other GR.3 drivers got quite that much dedicated CARQUAL time before embarking on their first all expense paid cruise! |
As I remember, the training was something like " she is alongside in Pompey, don't dump down to landing weight until you are cleared to land". Cleared to land, dumped fuel, then told to hold off because of floating crane crossing the stern! Landed anyway - first DL!
Swing the lamp! |
page 27 of NAO report above:
“...Training pilots to fly the Lightning II jets requires eight to nine months of specialist training, in addition to four years of general fast-jet pilot training....” [Comptroller and Auditor General, Military Flying Training, Session 2015-16, HC 81, National Audit Office, June 2015.] |
Delays - cost overruns
Here we go again! The only surprise is that people are surprised !! |
And they are still short of sailors to man them, sorry, crew them.
Navy's £6.2bn warships at 'risk' because of understaffing | Daily Mail Online |
There was a report on the 200 plus faults and failures to meet specification and operational parameters of the F35 published in the last few days, anyone got a link to it?
|
Originally Posted by glad rag
(Post 9708678)
There was a report on the 200 plus faults and failures to meet specification and operational parameters of the F35 published in the last few days, anyone got a link to it?
Last week, the U.S. Navy stood down its entire fleet of Boeing F/A-18E/F Super Hornets and EA-18G Growlers following an accident at Whidbey Island Naval Air Station in Washington state. As a result, the bulk of the Navy’s strike fighter force was effectively out of action for almost four days. The accident is the latest in a series of incidents that has been plaguing the Navy’s F/A-18 series fighters... |
All times are GMT. The time now is 12:46. |
Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.