PPRuNe Forums

PPRuNe Forums (https://www.pprune.org/)
-   Airlines, Airports & Routes (https://www.pprune.org/airlines-airports-routes-85/)
-   -   Carlisle-2 (https://www.pprune.org/airlines-airports-routes/602150-carlisle-2-a.html)

Harry Wayfarers 5th Sep 2017 11:25


You have to leave the UK to go anywhere unless you want to go to ABZ
What a strange statement, is ABZ not in UK, can one not travel literally anywhere from LHR, is LHR not in UK either?


HS3 a distant dream , which is NOT coming to Carlisle it fizzles out at Crewe. We are talking the here and now.
We're not allowed to discuss trains here but just check out website traveline for, here and now, train times, we'd probably only need HS3 to compete with something supersonic!

GLOworm 5th Sep 2017 12:17

Aah... Onyxcrowle. I've missed you.

Planespeaking 5th Sep 2017 13:40

What a novel way of expressing a thought process.

Robert-Ryan 5th Sep 2017 14:15


Originally Posted by EGPO
DTV is almost dead .

No it isn't, quite the opposite in fact, and if talk is to be believed Loganair is only the tip of the iceberg.

What became of the RGF route(s) from Carlisle?

SWBKCB 5th Sep 2017 14:21

Before this "easyJet to Carlisle" malarkey spreads any further, have a look at the new terminal plans approved last month and try and imagine 150 pax in there... :eek:

17/0568 | Variation Of Condition 2 (Approved Documents) Of Previously Approved Permission 10/1116 To Enable The Construction Of A Stobart Rail And Terminal Facility Including Minor Changes To The Apron, Circulation Areas And Landscaping | Carlisle Ai

Andy_S 5th Sep 2017 14:57


Originally Posted by GLOworm (Post 9882941)
Aah... Onyxcrowle. I've missed you.

I knew I'd seen that stream of consciousness before........:}

highwideandugly 18th Sep 2017 17:08

Anyone got the dates for the Carlisle closure for the runway realignment??

See the Fire Cover has been permanently reduced is that because of the closure?

NorthSouth 19th Sep 2017 11:53

They're not realigning the runway, they're sticking with the existing alignment and length but "raising and re-profiling" it. The realigned runway proposal dates back to 2007 but was withdrawn the following year when it got called in by central government.

highwideandugly 15th Nov 2017 16:31

Any further news on progress at Carlisle?

inOban 15th Nov 2017 16:43

Imminent and definitely opening next summer, according to a Stobart executive quoted in the local newspaper. The meeting was about the bonkers scheme to extend the Borders line to Carlisle.

fjencl 15th Nov 2017 20:05

https://www.cumbriacrack.com/2017/11...lisle-airport/

southside bobby 20th Nov 2017 08:52

Stobart Group`s regional distribution centre at Carlisle Airport has been sold for £23.61m.
Is this continuing the sale of the family silver perhaps?.

fjencl 20th Nov 2017 09:37

Maybe they will use the money from the sale to invest in the airport.
Who knows

N707ZS 20th Nov 2017 09:57

Who did they sell it to?

GrahamK 20th Nov 2017 10:04

A company called Tritax Big Box apparently

southside bobby 20th Nov 2017 10:06

There is a trend developing with the sale of assets.

highwideandugly 20th Nov 2017 13:19

That’s interesting..will they still have the commitment to developing the airport..or will it be up to the new owners??

fjencl 20th Nov 2017 13:28

The new owners only bought the distribution centre , not the airport.

highwideandugly 20th Nov 2017 13:45

Amazing though when you consider the “Kerfuffle” to obtain the land against a lot of local opposition,to sell the centre off so quickly? No doubt we will hear a statement re the airport soon.

horatio_b 20th Nov 2017 13:57

Stobart sold the distribution centre in February 2016 and is leasing it under a 20 year agreement. Value has increased by nearly £7m in past 18 months.

Disposal of Distribution Centre at Carlisle Airport for £16.925m

SWBKCB 20th Nov 2017 14:10


Stobart sold the distribution centre in February 2016
Why let a few facts get in the way of the speculation?

Andy_S 20th Nov 2017 14:44


Originally Posted by horatio_b (Post 9963336)
Stobart sold the distribution centre in February 2016 and is leasing it under a 20 year agreement. Value has increased by nearly £7m in past 18 months.

Maybe they sold it prematurely........

SWBKCB 20th Nov 2017 17:32

The 'catalyst' comment refers to the original sale back in 2016.

southside bobby 20th Nov 2017 17:40

fjencl..
We are both wrong I`m afraid not helped by poor local newspaper reporting.
Reading several reports carefully together it is thus...
Your header "the sale would be a "catalyst" for inward investment at the airport is old news & was a statement by Stobart Group in 2016 when the logistics centre was sold by them originally.
The sale today is Stobart`s landlord selling the premises on & as is stated by them today this is not a Stobart Group sale.
A question remains tho where were the £16.925m proceeds from 2016 "invested",not it appears so much in CAX.

fjencl 20th Nov 2017 17:52

Thanks very much for that clarification.......

fjencl 20th Nov 2017 17:57

Looking at the plans for the new passenger terminal proposed, is it not the case that it is connected/incorporated to the distribution centre.

Interesting times maybe/not ahead.........for passenger flights.

Time will tell, how much time nobody knows.

Summer 2018 !!!!!!!

SWBKCB 20th Nov 2017 19:36


is it not the case that it is connected/incorporated to the distribution centre
I thought it was alongside the distribution centre, but a separate building - not physically connected.

nighthawk117 21st Nov 2017 09:40

My understanding was that it was to be incorporated into the top right corner of the existing freight distribution building. Unfortunately I can't find any drawings to back up that plan.


Amazing though when you consider the “Kerfuffle” to obtain the land against a lot of local opposition,to sell the centre off so quickly? No doubt we will hear a statement re the airport soon.
You're reading too much into it. It's just juggling money around on the balance sheet to free up cash for future investments - why have £16m of cash tied up in a warehouse, when you can sell it on, free up the cash and re-invest it somewhere else?

Stobarts signed a 20 year lease on the building after selling it, so they'll be around for a long time yet.

fjencl 21st Nov 2017 09:58

Maybe news will be forthcoming at this event
 
https://www.eventbrite.co.uk/e/carli...ts-38889608867

nighthawk117 21st Nov 2017 12:46

Looks like plans have changed again....

I just came across this proposal for "Eden Park":
Eden Park. A landmark North West business development

This land designated for Eden Park was originally earmarked for aircraft stands, some intended for use as part of scheduled movements, others designed for aircraft storage.

There now doesn't appear to be any sort of plan for aviation related activity at the airport. Surprise surprise :)

fjencl 21st Nov 2017 12:57

Time will tell...........

SWBKCB 21st Nov 2017 14:33

The diagrams showing the land available for development certainly seem to include the area where planning permission has been granted for the new terminal/Stobart Rail HQ building.

nighthawk117 21st Nov 2017 18:15

I'm not aware of any plan for a new terminal other than inside the existing freight distribution building, or of a stobart rail HQ. Here is the original site plan, as approved:

https://i.imgur.com/Wp91RN8.png

SWBKCB 21st Nov 2017 18:22

Here's the latest planning application from June this year:


17/0568 | Variation Of Condition 2 (Approved Documents) Of Previously Approved Permission 10/1116 To Enable The Construction Of A Stobart Rail And Terminal Facility Including Minor Changes To The Apron, Circulation Areas And Landscaping | Carlisle Airport, Irthington, Carlisle, CA6 4NW

17/0568 | Variation Of Condition 2 (Approved Documents) Of Previously Approved Permission 10/1116 To Enable The Construction Of A Stobart Rail And Terminal Facility Including Minor Changes To The Apron, Circulation Areas And Landscaping | Carlisle Ai

nighthawk117 21st Nov 2017 18:27

Thanks SWBKCB, just found them. Silly me, you know the one place I didnt look for the plans? This thread!

Here's the new proposal, a standalone terminal on the other side of the freight distribution centre. All in all, this may be a good thing for the airport. The expanded industrial estate will bring in extra revenue, which will help to keep the doors open. Hopefully the tenants will generate some cargo demand too, and bring in the occasional cargo flight.

https://i.imgur.com/xNr63BB.jpg

SWBKCB 21st Nov 2017 18:32

But the brochure for the new Eden Park development shows the site of the terminal up for grabs, and one of the proposed layouts shows an industrial unit in the middle of the terminal apron.

There is no new terminal (more realistically Stobart HQ building) anywhere to be seen in the Eden Park bumph

nighthawk117 21st Nov 2017 18:35

hedging their bets? If no-one wants the space, they'll build a terminal... eventually?

fjencl 21st Nov 2017 19:26

I am sure the Eden Park had a date of December 2016, then the new revised Plans/details came into effect June 2017, we shall see what/if happens in the near future with any announcements/news forthcoming after the 7th December meeting.

bad bear 21st Nov 2017 20:11

I feel sure the terminal will need more than the 90 car parking spaces that show on the above plan if it is to have enough passengers to make it viable, is there a long term car park somewhere? How many spaces do other small airports have ( Teeside?)

SWBKCB 21st Nov 2017 20:15

Don't need many spaces for a couple of ATR's a day. If you look at the terminal plans, it's an office block for Stobart Rail with very basic facilities for limited pax numbers (still a step up from the current terminal...)


All times are GMT. The time now is 09:51.


Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.