Since the
original thread was closed...
PT. Cardig Air, PK–BBY, Boeing 737-300 F Preliminary Report
Some info from the report:
- The 737-300 Freighter had 14,610 kg of cargo
- The Captain was PF, Indonesian, ATPL with 13880 hrs total including 4877 hrs on type
- SIC PM, Korean, CPL with 608 hrs total including 342 hrs on type
- The aircraft touched down 35 meters short of Wamena RWY 15 with a vertical acceleration of 3.68 G
- Wamena weather was 408m SCT, winds 150/15 and visibility > 10 km
- RWY 15 VASI was inop
- FDR analysis found several other hard landings (> 2.1 G) and deviations from stable approach criteria at Wamena within the preceding 107 flight hours of this aircraft