Talking of oversize holes, I used to work for a helicopter manufacturer who designed and embodied a flotation bag modification for the British Army. They used the forward undercarriage mountings as the main attachment points for the flotation bags. Unfortunately they carried out the modification at a time when the aircraft was stripped down and jacked up for heavy maintenance. When the aircraft was rebuilt, lowered off jacks and fuelled up, The 8mm holes didn't even come close to lining up. The solution was to drill out one set of holes to 12mm and the other set of holes to 13mm then use the original 8mm bolts with very big washers to clamp the thing up. Cringeworthy
Join Date: Sep 2019
Location: leftcoast
Posts: 2
Likes: 0
Received 0 Likes
on
0 Posts
6 thou? How could such a gross oversize get through? I'd expect an interference fit and 6 thou would have been obvious. Even close fit is on 5-15 ten thou and 6 thou should have been clearly too loose when installing.
Properly done, with correct size mandrel, the stressed area of significance typically exists for one radius external to the origional hole eg start with a 1/4 nominal hole, radius = 1/8 inch. = giving a radial stressed area equal to about 1/2 inch diameter. And usually due to how the aluminum part was processed/rolled, the resulting hole will be slightly elongated ( ellipitical ) by as much as a few thousandths, again depending on material and hole size. Thus to mmaintain a proper interference fit, a follow up ream is required. The preceeding is an overly simplIfied explantion of course.
Sort of a side note- if you want to raise the hair on your friendly stress person, talk about vertical scratches in a structural hole... which then leads to trying to make a sleeve with a spiral opening. Which made early attempts to make a practical sleeve a real problem. After much soul searching, a simple vertical split in the coldworking sleeve was tried, worked great. But still the issue was a major discussion of what about- what if.... etc. So a significant test program was initiated in 60's-70's , with groups of holes and individual holes coldworked with various sleeve split orientations to see if eventual failure was along the vertical split opening or somehow related. Bottom line- end result- no significant relationship re sleeve orientation and eventual overload- fatigue failure.
Join Date: Sep 2019
Location: USA
Posts: 3
Likes: 0
Received 0 Likes
on
0 Posts
Most Hi-Lok installations are interference fit and we use a Rivet Gun [Variable Trigger] with a Flush Set with Brass Face to drive the Hi-Lok into the structure.
.006 O/S Hole the Hi-Lok would fall into the hole or be easily pushed into the hole with the fingers.
Join Date: Oct 2019
Location: Germany
Posts: 3
Likes: 0
Received 0 Likes
on
0 Posts
newly enlisted, Hello all around.
Boeing seems to have handed out information that
Classic, NG and MAX do not show the same design.
(i.e. pickle fork issue is deemed to be a distinct NG problem)
What differentiates the NG and MAX pickle fork designs?
Or lies the diference just in having changed suppliers?
Boeing seems to have handed out information that
Classic, NG and MAX do not show the same design.
(i.e. pickle fork issue is deemed to be a distinct NG problem)
What differentiates the NG and MAX pickle fork designs?
Or lies the diference just in having changed suppliers?
Yes it would be obvious if the hole in ONE piece was perfectly in line with the hole in the other piece. But my **GUESS **is that the hole in the pickle fork was drilled in a jig, and the hole in the Fail safe strap was drilled/enlarged on final assembly, and most probably never reamed as an assembly.
I've been involved with similar stack ups and they were always clamped up then final work was done on the assembly.
Join Date: Sep 2019
Location: USA
Posts: 3
Likes: 0
Received 0 Likes
on
0 Posts
The Boeing 737 - 800 has cracking issues all over the aircraft including the Aft Pressure Bulkhead - Main Frames in main cabin where the overhead bins attach to the frame. Numerous cracks on the -800 main cabin Frames at the overhead bin lower mounts were discovered during the first Major Check.
[After 5 years in service]
The NG and later aircraft structures - in my opinion - do not even compare to the early generation 707-727-737-747. Lots of the major structure parts on NG's were made with lighter gage materials including frames- stingers- skins- bulkheads in an effort to save weight.
The skin and stringers above the main cabin floor line required bonded doublers called "acoustic dampeners" to reduce the vibration and buzzing of the airframe on the -800.
The ones on the stringer hats look like railroad tracks. The ones on the skin has a corrugated look.
I expect for many more cracking issues to arise as the NG Fleets age.
[After 5 years in service]
The NG and later aircraft structures - in my opinion - do not even compare to the early generation 707-727-737-747. Lots of the major structure parts on NG's were made with lighter gage materials including frames- stingers- skins- bulkheads in an effort to save weight.
The skin and stringers above the main cabin floor line required bonded doublers called "acoustic dampeners" to reduce the vibration and buzzing of the airframe on the -800.
The ones on the stringer hats look like railroad tracks. The ones on the skin has a corrugated look.
I expect for many more cracking issues to arise as the NG Fleets age.
I agree, in the quest to save weight there are a lot of thinner gauge parts. The cargo bays also suffer from the cracking of minor parts.
The Aft Pressure Bulkhead inspection is a hangover from the Classics, these were known to crack in the "Y" Chord area. I'm not aware of any cracks being found on the NGs.
The Aft Pressure Bulkhead inspection is a hangover from the Classics, these were known to crack in the "Y" Chord area. I'm not aware of any cracks being found on the NGs.
Join Date: Sep 2019
Location: leftcoast
Posts: 2
Likes: 0
Received 0 Likes
on
0 Posts
I agree, in the quest to save weight there are a lot of thinner gauge parts. The cargo bays also suffer from the cracking of minor parts.
The Aft Pressure Bulkhead inspection is a hangover from the Classics, these were known to crack in the "Y" Chord area. I'm not aware of any cracks being found on the NGs.
The Aft Pressure Bulkhead inspection is a hangover from the Classics, these were known to crack in the "Y" Chord area. I'm not aware of any cracks being found on the NGs.
Then started the major change in 737 production and the emphasis on ' shareholder value " - the faster- cheaper game. All sorts of inspection and procedures were ' trimmed ' and now the rest is history. Name a major program in commercial that since that date has not had late deliveries, over budget, criminal activity resulting in club fed time, shareholder lawsuits for ' lack of candor ' screwing over of unions, moving corporate HQ, etc.
MDC has been more than a " cancer" its been a plague. And apparently the worst is yet to come . .
Join Date: Mar 2014
Location: Way north
Age: 47
Posts: 497
Likes: 0
Received 0 Likes
on
0 Posts
Maybe it's time someone sit down, look at how things work in the world, and see if it's possible to come up with a new philosophy that can actually handle the "problems" all the old ones generate...
That is not only an aviation thing.... it's called "capitalism" or "liberalism" at it's best. The thing we all swear is the saviour of this world, is beginning to show the signs of "old age"....
Maybe it's time someone sit down, look at how things work in the world, and see if it's possible to come up with a new philosophy that can actually handle the "problems" all the old ones generate...
Maybe it's time someone sit down, look at how things work in the world, and see if it's possible to come up with a new philosophy that can actually handle the "problems" all the old ones generate...
It is almost always a lot easier and more lucrative for management to goose the share price with a big stock repurchase program that to risk a new investment that may not pay off.
The pernicious longer term effect include a surrender of market position, but the culprits will likely have retired by then. Nearer term, the short term mind set drives efforts to minimize all costs, including worker compensation, development efforts and compliance standards.
Seen that firms that did take investment risks, such as IBM with the S360 or Boeing with the 747, were hugely rewarded, one must assume that there has been a loss of courage in the industrial management mindset, perhaps driven by pressures generated by 'shareholder activists'.
Perhaps punitive short term capital gains taxes might help return the focus to longer term investment, or incentives for longer term returns such as extended vesting schedules, but no consensus has yet developed on this.
Join Date: Mar 2019
Location: On the Ground
Posts: 155
Likes: 0
Received 0 Likes
on
0 Posts
Don't think capitalism is the issue...
It is almost always a lot easier and more lucrative for management to goose the share price with a big stock repurchase program that to risk a new investment that may not pay off.
... the short term mind set drives efforts to minimize all costs, including worker compensation, development efforts and compliance standards.
It is almost always a lot easier and more lucrative for management to goose the share price with a big stock repurchase program that to risk a new investment that may not pay off.
... the short term mind set drives efforts to minimize all costs, including worker compensation, development efforts and compliance standards.
So how much money did the new style pickle fork save Boeing ? How much are they going to be on the hook for the repair ?
Wiki says that 7,031 B737 NGs have been delivered.
Only those NGs that have exceeded 30,000 cycles need to be checked within 7 days, (or 22,600 cycles within + 1000 cycles).
FAA estimate that only 1911 (US aircraft) are affected of the 7,031 that have been delivered so far (presumably because most haven't yet reached 30,000 cycles).
This will be an ongoing problem for many years to come as each and every one of the 7,031 delivered air frames reaches the AD cycle inspection requirements.
Say 5% of inspected aircraft fail the AD at 30,000+ cycles, what percentage of the remainder will subsequently fail the AD Inspection at say 40,000, 50,000, 60,000 cycles etc?
Only those NGs that have exceeded 30,000 cycles need to be checked within 7 days, (or 22,600 cycles within + 1000 cycles).
FAA estimate that only 1911 (US aircraft) are affected of the 7,031 that have been delivered so far (presumably because most haven't yet reached 30,000 cycles).
This will be an ongoing problem for many years to come as each and every one of the 7,031 delivered air frames reaches the AD cycle inspection requirements.
Say 5% of inspected aircraft fail the AD at 30,000+ cycles, what percentage of the remainder will subsequently fail the AD Inspection at say 40,000, 50,000, 60,000 cycles etc?
Join Date: Jul 2009
Location: Asia
Age: 62
Posts: 131
Likes: 0
Received 0 Likes
on
0 Posts
Qantas will inspect 33 of its Boeing 737 aircraft by the end of this week after it discovered structural cracks on one of the short-haul jets that are the backbone of its domestic operations.
https://www.smh.com.au/business/comp...30-p535xo.html