A320 External Pneumatic Start Checklist
Thread Starter
Join Date: Aug 2001
Location: Above the Horizon
Posts: 124
Likes: 0
Received 0 Likes
on
0 Posts
A320 External Pneumatic Start Checklist
Can someone please clarify as to how one goes about setting the cockpit for an External Pneumatic Start followed by a Cross Bleed Start?
As I understand both PM and PF first review the procedure together and then the overhead panel is set up.
To be more specific , does the PM read the Checklist and set the switches/knobs or does the PM read and the PF set up the overhead panel. Any reference to FCOM will be appreciated. Thanks.
As I understand both PM and PF first review the procedure together and then the overhead panel is set up.
To be more specific , does the PM read the Checklist and set the switches/knobs or does the PM read and the PF set up the overhead panel. Any reference to FCOM will be appreciated. Thanks.