Go Back  PPRuNe Forums > Flight Deck Forums > Tech Log
Reload this Page >

JAR FSTD (A) translation

Wikiposts
Search

Notices
Tech Log The very best in practical technical discussion on the web

JAR FSTD (A) translation

Thread Tools
 
Search this Thread
 
Old 30th July 2010 | 16:54
  #1 (permalink)  
Thread Starter
 
Joined: Sep 2009
Posts: 20
Likes: 0
From: Warsaw, Poland
JAR FSTD (A) translation

Hi,

I am having trouble in understanding couple phrases from new JAR-FSTD (A) publication. Is anybody able to help me with following words concerning simulator qualification?

1. "Scene Quality
- demonstration of occulting through each channel of the system in an operational scene"

Could you please let me know what does this "occulting" mean in the connection with FFS scene quality?


2. "FSTD operators are required to monitor compliance with the procedures they have designed to ensure specified performance and functions. In doing so they should as a minimum, and where appropriate, monitor:
-Defect deferral"


Another phrase which is difficult for me to correctly understand.

I would appreciate any translation in other words or more specific description of what author could possibly mean by those expressions.

Thanks!


Luckystar77 is offline  
Reply
Old 30th July 2010 | 16:58
  #2 (permalink)  
20 Anniversary
 
Joined: Apr 2004
Posts: 228
Likes: 0
From: The Attic
The occulting requirement refers to the ability of the visual to display a minimum of 10 objects such as buildings or signs placed behind each other in a scene in the correct order, without one behind bleeding through one in front. Primarily an issue for older visuals, modern ones like CAE Tropos use Z-buffering. The older systems like Vital and Maxvue use occulting planes, which have to be added manually into every scene by the modeller.

Deferral or rather "to defer" is a fancy word for procrastination
A-FLOOR is online now  
Reply
Old 30th July 2010 | 17:18
  #3 (permalink)  
15 Anniversary
 
Joined: Jun 2009
Posts: 594
Likes: 72
From: VA, USA
I defer (sic) to A-Floor with respect to the explanation of scene occultation but that written seems perfectly reasonable and clear.

As to the second phrase, "defect deferral" is basically an attempt to use some excuse to delay fixing something that is known to be broken. In other words the operator of an FSTD should not simply hold-off from fixing something simply because it is inconvenient or tricky to take care of it.

- GY
GarageYears is offline  
Reply
Old 30th July 2010 | 22:12
  #4 (permalink)  
Thread Starter
 
Joined: Sep 2009
Posts: 20
Likes: 0
From: Warsaw, Poland
That was such a quick help!! Thank you guys!
Luckystar77 is offline  
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.