Go Back  PPRuNe Forums > Flight Deck Forums > Tech Log
Reload this Page >

All weather operation table 6-1

Wikiposts
Search
Tech Log The very best in practical technical discussion on the web

All weather operation table 6-1

Thread Tools
 
Search this Thread
 
Old 8th Feb 2010, 03:44
  #1 (permalink)  
Thread Starter
 
Join Date: Feb 2010
Location: South Korea
Age: 43
Posts: 7
Likes: 0
Received 0 Likes on 0 Posts
All weather operation table 6-1


Hi, there

Let me ask you something.

According to ICAO doc 9365 Table 6-1 take-off minima

Facilities
RVR/VIS
Runway edge lights, runway centre line lights, centre line markings,
and TDZ, MID and stop-end RVR
175m
Runway edge lights and either centre line lights or centre line markings
500m



"Runway edge lights and either centre line lights or centre line markings = 500m"


Is 500m RVR or VIS? If 500m is RVR, is it TDZ RVR?


and second question is.....


I'll give you 3 scenarios.


our airport has full facilities with 3 RVRs. and take-off minima is 150m
TDZ MID Roll-out
1) 500, 150, 100


2) 500, 100, 100


3) 150, 100, 100 but VIS is observed 500m


Does local air traffic controller issue take-off clearence above each occasion?


and could you give me a related basis or regulation?


I'm confused these days. please help me....
seoulapp is offline  
Old 8th Feb 2010, 08:30
  #2 (permalink)  
 
Join Date: Oct 2009
Location: UK
Posts: 1,270
Likes: 0
Received 0 Likes on 0 Posts
Hi seoulapp,

1) If your performance is such that your accelerate to V1 and stop distance is 2/3 rds of the the runway length available (so you can show you will be below 60 kts by the last 1/3 rd) - then you can ignore the stop end RVR. So you can take off under 500 150 100

2) Mid point RVR is below limits - so you can't take off.

3) You can only assess the take off visibility for the first part. The mid point is beyond 500m so you can't judge the visibility there - you have to accept the RVR value - so you can't take off.

ATC don't know your limits - so provided the RVR is equal to or above the minimum RVR published for the airport, they can offer clearance.
rudderrudderrat is offline  
Old 8th Feb 2010, 12:47
  #3 (permalink)  
 
Join Date: Nov 2005
Location: right here
Posts: 342
Likes: 0
Received 0 Likes on 0 Posts
ATC will always clear you for TO or LD. if you're past night curfew or doing a NDB in VV// conditions - not their problem - but YOURS.
unless the airport is closed due to snow, crash or whatever.
FCS Explorer is offline  
Old 8th Feb 2010, 18:44
  #4 (permalink)  
 
Join Date: Sep 1998
Location: wherever
Age: 55
Posts: 1,616
Likes: 0
Received 0 Likes on 0 Posts
RRR

I believe the 60kts in your point 1 only applies to the landing case. At least it is only specifically stated as such in EU ops. "Relevant" for the take off case is not defined and so I would consider the requirement to mean the accelerate stop distance for the take off conditions should be less than 2/3 of the TORA. I say TORA as I'm not sure if stopway is included in the positioning of the detectors used for RVR assessment.
FE Hoppy is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.