Go Back  PPRuNe Forums > Flight Deck Forums > Tech Log
Reload this Page >

Average D Check on 767

Wikiposts
Search

Notices
Tech Log The very best in practical technical discussion on the web

Average D Check on 767

Thread Tools
 
Search this Thread
 
Old 22nd June 2009 | 03:17
  #1 (permalink)  
Thread Starter
 
Joined: Feb 2006
Posts: 7
Likes: 0
From: USA
Average D Check on 767

Hello

Anyone here have an average time for a 767 D Check. I know there are many variables but I am only looking for a general idea. Thanks in advance.
Jolly1 is offline  
Reply
Old 22nd June 2009 | 04:19
  #2 (permalink)  
 
Joined: Mar 2000
Posts: 8,571
Likes: 3
From: Arizona USA
Most 767 aircraft are on MSG-3, and for the most part, D checks are a thing of the past.
OTOH, a few operators are behind the times...as usual.
411A is offline  
Reply
Old 22nd June 2009 | 07:20
  #3 (permalink)  
20 Anniversary
 
Joined: Apr 2004
Posts: 2,166
Likes: 86
From: Planet Earth
Like L1011 Operators ?
stilton is offline  
Reply
Old 22nd June 2009 | 12:04
  #4 (permalink)  
 
Joined: Mar 2000
Posts: 8,571
Likes: 3
From: Arizona USA
Like L1011 Operators ?
Actually, no, stilton...don't know about the RAF, but the L10 operators I know about are all on segmented C checks, therefore D checks are covered concurrently.
411A is offline  
Reply
Old 6th July 2009 | 21:40
  #5 (permalink)  
15 Anniversary
 
Joined: Sep 2006
Posts: 159
Likes: 1
From: uk
How long for a C check?
spacegrand is offline  
Reply
Old 8th July 2009 | 05:46
  #6 (permalink)  
Prof. Airport Engineer
 
Joined: Oct 2000
Posts: 726
Likes: 0
From: Australia (mostly)
In simplistic terms, the base check part of the MPD for the 767 family comprises a series of four C checks in a cycle, covering system, and structural and corrosion prevention and control programme (CPCP) tasks. They combine in various ways to create 12 checks – C1 to C12. The big checks are C4 (first base cycle), C8 (second base cycle), and C12 (third base cycle) (at 24,000 flight hours, 48,000 FH and 72,000 FGH respectively) and these are the equivalent of a ‘D’ check. There are also zonal tasks, which can be grouped with either system or structural tasks as necessary.

The routine inspections and non-routine defects for the four checks in the second base cycle (checks C5 to C8) total 23,000-24,500 manhours (MH), and increase to 27,000-28,500MH in the third base cycle (checks C9 to C12). Stripping and painting the aircraft adds about 2,500MH, and is done every 5 years or so. Interior refurbishment, galleys and toilets refurbished, and seats refurbished and even recovered will add another 4,500-5,500MH.

The total MH consumption for the C checks adds to the region of 36,000MH for the second base check cycle, and up to about 40,000MH for the third base check cycle. For most aircraft, the end of the third base cycle (and check C12) should correspond to 15-16 years age.
OverRun is offline  
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.