MAX’s Return Delayed by FAA Reevaluation of 737 Safety Procedures
Are MX engineers so desperate in the US that they would go for this temporary jobs?
That's exactly what I was thinking. Are there really hundreds of A&Ps and avionics techs sitting twiddling their thumbs or flipping burgers, or who will give up their current jobs for a few months living in a trailer at Moses Lake? The pay would have to be pretty seriously good, I would have thought. Sounds like more wishful thinking to me, along with the schedule.
If wages offered are sufficient then workers will move from their existing employment, though the level of pay will need to reflect the temporary nature of the work.
The pinch points would be with the high-specialisation jobs.
If Boeing are in a regulatory position to get the MAX fleet mobilised then I do not think the high level of wage they might need to offer will be any barrier to them.
Join Date: Dec 2018
Location: Florida
Posts: 247
Likes: 0
Received 0 Likes
on
0 Posts
Economic theory says that there are ALWAYS workers available - full employment is never achieved. There will always be a number of people in transition (at least) between jobs. There will also be people entering the labour (labor) market afresh. There will also be a group of people who have left the market but can be brought back in if the remuneration reaches a certain point.
If wages offered are sufficient then workers will move from their existing employment, though the level of pay will need to reflect the temporary nature of the work.
The pinch points would be with the high-specialisation jobs.
If Boeing are in a regulatory position to get the MAX fleet mobilised then I do not think the high level of wage they might need to offer will be any barrier to them.
If wages offered are sufficient then workers will move from their existing employment, though the level of pay will need to reflect the temporary nature of the work.
The pinch points would be with the high-specialisation jobs.
If Boeing are in a regulatory position to get the MAX fleet mobilised then I do not think the high level of wage they might need to offer will be any barrier to them.
Join Date: Jul 2001
Location: London
Posts: 90
Likes: 0
Received 0 Likes
on
0 Posts
"Boeing said Tuesday the current plan for handling this maintenance work is that all MAX airplanes that have been stored outside the Puget Sound region, either by Boeing itself or by airlines, will be flown to Seattle and Everett for delivery. Moses Lake will serve as a nearby staging ground to do some of the maintenance work ahead of the Puget Sound-area deliveries to airline customers."
Join Date: Jul 2002
Location: Ireland
Posts: 596
Likes: 0
Received 0 Likes
on
0 Posts
I do get where you are coming from though. Despite agreeing with most of what Maninthebar says about employment trends, I can’t help but think that the very best engineers are in stable, full time employment and certainly not looking for temporary, if well paid work, therefore Boeing will be recruiting from a ‘B team’ pool of candidates.
STN Ramp Rat,
It is always possible to do ferry flights safely with appropriate technical/operational restrictions and appropriately briefed crew. It is done all the time. What's so new about that?
It is always possible to do ferry flights safely with appropriate technical/operational restrictions and appropriately briefed crew. It is done all the time. What's so new about that?
For a start, if the fix is software only, as seems likely, then there is no reason why operators should not be able to embody the relevant SB themselves.
That aside, the logistics of having to return every Max aircraft in the world to Boeing are unthinkable, not least because there would be huge arguments among current operators about where their particular aircraft would be in the queue for what will inevitably be a long-drawn-out exercise.
Join Date: Jul 2002
Location: Ireland
Posts: 596
Likes: 0
Received 0 Likes
on
0 Posts
That aside, the logistics of having to return every Max aircraft in the world to Boeing are unthinkable, not least because there would be huge arguments among current operators about where their particular aircraft would be in the queue for what will inevitably be a long-drawn-out exercise.
Boeing will get it fixed, it is a worldwide leader on this business. Questions are how much it will cost and when it will be done, more of the first less of the leatest.
they will have a safe product, will not mess around with borderline solutions, they cannot afford it.
they will have a safe product, will not mess around with borderline solutions, they cannot afford it.
Economic theory says that there are ALWAYS workers available - full employment is never achieved. There will always be a number of people in transition (at least) between jobs. There will also be people entering the labour (labor) market afresh. There will also be a group of people who have left the market but can be brought back in if the remuneration reaches a certain point.
With limited resources, what will take priority? Getting the new, as-yet undelivered (and un-invoiced?) planes to their new owners, or doing the "retro-fit" work on existing planes to get them back in the air for their existing owners?
There must surely be commercial pressures at play here
There must surely be commercial pressures at play here
Join Date: Jun 2008
Location: Cambridge UK
Posts: 192
Likes: 0
Received 0 Likes
on
0 Posts
I don't know if you have followed the story, but this Gung-Ho attitude is precisely what got us to this position in the first place. Boeing did NOT build a safe product, they DID mess around with a borderline solution - that is why it is grounded. And the same management are still there.
It really must be having a chilling effect on relationships with other authorities that both Boeing and the FAA don't
seem to recognise that they have erred in any way. How can you reform without recognition of past failings?
Join Date: Jun 2019
Location: VA
Posts: 210
Likes: 0
Received 0 Likes
on
0 Posts
The same. Um … this is aviation engineering, not a burger flipping joint. Look at the difficulty Boeing have had at Charleston with a new workforce compared to Seattle. And these people will need the right licences to work on the aircraft. There aren't many who have Max licences around at the moment, and certainly, of those few, who want to go and live in a company-supplied (always the worst) trailer in inland Washington through the winter. And who can see Mr Cost-Conscious at Boeing, possibly the same one who outsourced the MCAS programming to the low bidder, offering unresistable salaries. No, quotes from "MBAs for Dummies" about "Economic Theory says …" are what got HQ at Chicago into much of this from the start.
As far as the actual modifications required to reconfigure the MAX's, as far as I am hearing it will only involve new software/firmware in the FCC's. This may just be a software upload or at most swapping out circuit boards followed by some kind of verification checks. I strongly suspect that the vast majority of labor hours will be sucked up in the tasks related to taking the aircraft out of storage. It is not simply a matter of starting up the engines and taxiing away. The longer these planes sit, the more time that will be required to return them to flight status.
Last edited by Tomaski; 21st Aug 2019 at 19:37.
House of Commons Hansard Written Answers for 11 Mar 1997 (pt 18)
" Airwork Ltd.
Mr. Sweeney: To ask the Secretary of State for Defence if he will make a statement on his Department's claim for compensation for damage caused to Tornado F3 aircraft by Airwork Ltd. [20069]
Mr. Arbuthnot: A negotiated settlement has been reached in respect of my Department's claim for structural damage to Tornado F3 aircraft while being modified by Airwork Ltd. during 1992-93. I am pleased to report that, of the 16 aircraft involved, 11 have been repaired and delivered back to the RAF and the remainder will be delivered progressively over the next few weeks, with the last due for delivery in May this year. One aircraft was lost in the crash off Blackpool in September 1996, the cause of which was not related to the modification programme on which Airwork had been engaged. The F3 aircraft were repaired by replacing the damaged centre fuselages with those from surplus F2 aircraft which had been earmarked for disposal. This was to ensure that the aircraft were returned to operational service as soon as possible. [...] The overall cost of this work has been around £20 million...." (= £40M at today's prices)
Hansard is the UK official record of Parliamentary business. Airwork Ltd employed inadequately skilled labour to do structural modifications to some RAF fighter aircraft, with disastrous results (cold chisels used to remove rivet heads, and other howlers). They also damaged 11 x C130.
Bottom line, if you are going to do work on aircraft of any description you need to use appropriately skilled engineers. Nothing new here!
" Airwork Ltd.
Mr. Sweeney: To ask the Secretary of State for Defence if he will make a statement on his Department's claim for compensation for damage caused to Tornado F3 aircraft by Airwork Ltd. [20069]
Mr. Arbuthnot: A negotiated settlement has been reached in respect of my Department's claim for structural damage to Tornado F3 aircraft while being modified by Airwork Ltd. during 1992-93. I am pleased to report that, of the 16 aircraft involved, 11 have been repaired and delivered back to the RAF and the remainder will be delivered progressively over the next few weeks, with the last due for delivery in May this year. One aircraft was lost in the crash off Blackpool in September 1996, the cause of which was not related to the modification programme on which Airwork had been engaged. The F3 aircraft were repaired by replacing the damaged centre fuselages with those from surplus F2 aircraft which had been earmarked for disposal. This was to ensure that the aircraft were returned to operational service as soon as possible. [...] The overall cost of this work has been around £20 million...." (= £40M at today's prices)
Hansard is the UK official record of Parliamentary business. Airwork Ltd employed inadequately skilled labour to do structural modifications to some RAF fighter aircraft, with disastrous results (cold chisels used to remove rivet heads, and other howlers). They also damaged 11 x C130.
Bottom line, if you are going to do work on aircraft of any description you need to use appropriately skilled engineers. Nothing new here!
Join Date: Feb 2013
Location: Gloucestershire, UK
Posts: 34
Likes: 0
Received 0 Likes
on
0 Posts
That's the thing about trust. Once you've lost it.....
Join Date: Jul 2002
Location: Ireland
Posts: 596
Likes: 0
Received 0 Likes
on
0 Posts
With limited resources, what will take priority? Getting the new, as-yet undelivered (and un-invoiced?) planes to their new owners, or doing the "retro-fit" work on existing planes to get them back in the air for their existing owners?
There must surely be commercial pressures at play here
Even Boeing should see this.
Join Date: Dec 2006
Location: Florida and wherever my laptop is
Posts: 1,350
Likes: 0
Received 0 Likes
on
0 Posts
The other undelivered aircraft currently parked in Washington State, I would expect to be brought up to flying / deliverable state in order-book order by teams of Boeing and contractor staff and then flown out as normal by customer crews.
It makes sense for preparations to be made so that deliveries and maintenance/upgrades can be made as fast as possible once the green light is given.
Obviously though the green light has not been given - yet.
On the financial front everyday those grounded aircraft are clocking up leasing and other financial charges while generating no income.
Boeing continue to employ workers to make undelivered aircraft.
The bill must be colossal?
Boeing continue to employ workers to make undelivered aircraft.
The bill must be colossal?
Psychophysiological entity
Assuming drip checks, are there any advanced fuel analyses that have to be done on months-old fuel?
If I was given the task of ferrying an aircraft that had been standing for months, I would want to be involved in the engine runs, extensive pre-flights and at least one accelerate-stop before each takeoff. Anyone think this unreasonable?
If I was given the task of ferrying an aircraft that had been standing for months, I would want to be involved in the engine runs, extensive pre-flights and at least one accelerate-stop before each takeoff. Anyone think this unreasonable?
Join Date: Mar 2015
Location: Washington state
Posts: 209
Likes: 0
Received 0 Likes
on
0 Posts
That is an excellent question, but the problem is not the fuel so much as what grows in it and the water that it attracts. I would assume that the planes are being stored empty, perhaps with the tanks inerted? All filters will have to be changed of course. In the marine world this is a real problem especially if tanks are stored partially full because the sides of the tanks condense water and bugs grow in it. They then fall to the bottom of the tank, and as you get towards empty (or in rough conditions) they get stirred up and clog the filters. I have no idea what the procedure is in the aircraft world to prevent this, I doubt you have fuel polishing onboard or the ability to spin on a new Raycor filter in flight. There are some microbes that destroy aluminum, so if this is not handled properly a bunch of fuel tanks would need to be replaced.'
There are tests for fuel quality and the presence of microbes, and it might not be a bad idea for pilots to demand to see the results before flight.
One thing that I find concerting is that Boeing downplayed the probable length of the grounding for so long that I wonder if all airlines took the proper procedures for long term storage of the planes. I'm sure that most airlines are capable of prepping a plane for long term storage, but in the chaotic conditions of the sudden mass grounding, and the unexpectedly extended length of the grounding give Mr. Murphy a lot of room to play with.
This is one thing that Boeing absolutely has to get right. Any little problems are going to be blown up by the media simply because it is a MAX. Any in-flight problem that causes a return would be catastrophic and if any plane hits the bricks for any reason then it is game over for Boeing, they will become just another subsidiary of China, inc. I think that they probably realize that now, but the trick is going to be to figure out how to release these planes with zero failures. Absolutely zero, if the chief engineer has to inspect each one himself.
There are tests for fuel quality and the presence of microbes, and it might not be a bad idea for pilots to demand to see the results before flight.
One thing that I find concerting is that Boeing downplayed the probable length of the grounding for so long that I wonder if all airlines took the proper procedures for long term storage of the planes. I'm sure that most airlines are capable of prepping a plane for long term storage, but in the chaotic conditions of the sudden mass grounding, and the unexpectedly extended length of the grounding give Mr. Murphy a lot of room to play with.
This is one thing that Boeing absolutely has to get right. Any little problems are going to be blown up by the media simply because it is a MAX. Any in-flight problem that causes a return would be catastrophic and if any plane hits the bricks for any reason then it is game over for Boeing, they will become just another subsidiary of China, inc. I think that they probably realize that now, but the trick is going to be to figure out how to release these planes with zero failures. Absolutely zero, if the chief engineer has to inspect each one himself.
Last edited by Water pilot; 22nd Aug 2019 at 04:33.
Join Date: Jan 2013
Location: Seattle Area
Posts: 263
Likes: 0
Received 0 Likes
on
0 Posts
Short term storage advice is to store them with full (or close to full between engine runs) tanks with biocide additive and sump drains checked for water periodically. The more fuel in the tank the less ullage volume, the less air (with moisture) drawn in with each daily temperature cycle, and the less condensation of water in the tank. It's the same approach most people take with a fishing boat stored over the winter.