Go Back  PPRuNe Forums > Aircrew Forums > Rotorheads
Reload this Page >

allison AD for explosion rings

Wikiposts
Search
Rotorheads A haven for helicopter professionals to discuss the things that affect them

allison AD for explosion rings

Thread Tools
 
Search this Thread
 
Old 17th Jun 2005, 13:03
  #1 (permalink)  
Thread Starter
 
Join Date: Apr 2004
Location: canada
Posts: 80
Likes: 0
Received 1 Like on 1 Post
allison AD for explosion rings

83 thousand touch it seems...
lamanated is offline  
Old 17th Jun 2005, 13:49
  #2 (permalink)  
 
Join Date: Mar 2002
Location: Iceland
Age: 58
Posts: 814
Received 1 Like on 1 Post
I assume you are reffering to this A.D.

Weīll aint that just great And I have only about 150 cycles left ītill overhaul.
Aesir is offline  
Old 17th Jun 2005, 13:57
  #3 (permalink)  
 
Join Date: Nov 2000
Location: USA - Mexico
Posts: 131
Received 0 Likes on 0 Posts
$87,325,000 is the estimated cost to US operators alone. I wonder what the world wide cost will be for a modification that does not address the failures, just a bandaid to contain the damage.

Read the whole thing, especially the comments and the FAA replies. Somebody is sleeping with Rolls-Royce!

http://www.airweb.faa.gov/Regulatory...A?OpenDocument
Lama Bear is offline  
Old 17th Jun 2005, 15:33
  #4 (permalink)  
cpt
 
Join Date: Dec 2002
Location: 1500' AMSL
Age: 67
Posts: 412
Received 1 Like on 1 Post
This engine explosion happened to me on a AS 355 F some years ago, just on take off to go long lining.
Allison twin sisters where torn off like old tin cans....on top of this they had set everething on fire because of auto relight.

Very lucky !
cpt is offline  
Old 17th Jun 2005, 15:40
  #5 (permalink)  
 
Join Date: Apr 2005
Location: East of the sun, west of the moon, straight on till morning
Posts: 73
Likes: 0
Received 0 Likes on 0 Posts
Someone fill me in...

So what's going on here? Has there been a rash of failures I haven't heard of? As far as I'm aware the 250 is a bloody reliable engine. We've had nary a peep of trouble with the ones we've run aside from occasional minor issues (e.g. fuel control / governor leaks, etc.) Somebody fill us in...
fling-wing_1 is offline  
Old 17th Jun 2005, 15:41
  #6 (permalink)  
 
Join Date: May 2002
Location: Downeast
Age: 75
Posts: 18,290
Received 518 Likes on 216 Posts
Times two for twins, right?
SASless is offline  
Old 17th Jun 2005, 18:30
  #7 (permalink)  
 
Join Date: Nov 2000
Location: Pewsey, UK
Posts: 1,976
Received 12 Likes on 6 Posts
Any idea if / when the UK will follow suit ?
The Nr Fairy is offline  
Old 17th Jun 2005, 19:21
  #8 (permalink)  
 
Join Date: Nov 2000
Location: USA - Mexico
Posts: 131
Received 0 Likes on 0 Posts
My understanding, and I'm not a mechanic, is that this has been a SB for over a year.

I would think you will get to pay too.
Lama Bear is offline  
Old 18th Jun 2005, 07:26
  #9 (permalink)  
 
Join Date: Mar 2002
Location: Iceland
Age: 58
Posts: 814
Received 1 Like on 1 Post
I with my very limited mathematical capability figured a much lower cost of $18.880.-

Am I missing something somewhere or what!

If you read the "Cost of Compliance" part then they say:

16 hrs to install blast ring
35 hrs for support assy
20 hrs for 1st & 2nd stage nozzle

71 M/hrs x $65 pr/hr
= $ 4.615.-

$10.765.- energy absorbing ring
$2.500.- for gas support assy
$1.000.- for nozzles.

$18.880.- Total

Itīs still a crime but lot less damage than nearly $90.000.-

One commenter requested that RRC should supply parts at no cost, but that was not accepted. Go figure..

Does anyone know what a "Gas producer support assembly" is? Out of 5000 engines on the US registry about 4000 will require this mod. I must assume it applies to the single engine B206B series then, since there are probably not that many 355F series in the US!

Is there any one out there that wants to buy a cheap JetRanger or sell me a recently overhauled 250 C20 that I can use until yr 2011

----------------------

Ohhh... I just woke up now! It seems that the total cost is $87 million total for ALL US operators. Just teaches you to read the stuff more thoroughly. Somebody even mentiones it above, just to many 0.. in one number

edited to add thinking after coffee.

Last edited by Aesir; 18th Jun 2005 at 08:35.
Aesir is offline  
Old 18th Jun 2005, 09:36
  #10 (permalink)  
 
Join Date: Jul 2000
Location: The Daylight Saving Free Zone
Posts: 733
Likes: 0
Received 0 Likes on 0 Posts
Does anyone know what a "Gas producer support assembly" is?
Aesir, the GP support is the first turbine casing attached to the rear side of the exhaust duct.

Dont overlook the compliance time for this AD ...

Compliance

(e) You are responsible for having the actions required by this AD performed at the next time the gas producer turbine rotor is disassembled for any reason, or within 1,750 hours time-since-last- overhaul, time-since-new, time-since-last-heavy-maintenance, or time-since-last-hot section inspection after the effective date of this AD, whichever occurs first, but no later than October 31, 2011, unless already done.
.. I would think most operators will end up having to comply at next overhaul.
sprocket is offline  
Old 18th Jun 2005, 16:27
  #11 (permalink)  
 
Join Date: Mar 2002
Location: Iceland
Age: 58
Posts: 814
Received 1 Like on 1 Post
Thanks Sprocket

Do you know if the Gas producer support assy is required for the B206 installation?

Yes thanks I was aware of the compliance time limits but since my 206 only flies about 200 hrs a year a newly overhauled engine would last me until 31st Oct. 2011 without having to do this AD. I assume that the AD does not apply when removing and installing engines, only when work is performed on the gas producer is dissasembled and/or repaired for any reason.

However since I now figured out that the AD only costs about $20.000.- then I guess I might as well have it done when my turbine is due in 150 cycles.

Might be good to have it done. I would simply hate to have that stage one wheel decide to leave the turbine and cut through the tail rotor driveshaft or worse yet decide to go up and pass through the main rotor blade on the way.

Best to have it done
Aesir is offline  
Old 18th Jun 2005, 18:48
  #12 (permalink)  
 
Join Date: Dec 2001
Location: At Work
Posts: 292
Likes: 0
Received 0 Likes on 0 Posts
Most C20B's already have an energy containment ring. Check your last overhaul paperwork to see if it has one. You can get the paperwork from the overhaul shop using the Work Order listed in your engine log books.

In the event you do not, In addition to the usual costs associated with a hot section overhaul, you will need to have your GP support modified in order for the Containment Ring to be inserted. If you are purchasing a used aircraft, it is definitely something to check.

AESIR, if you can have your number 1 and 2 nozzle overhualed for $1,000 I need the name of your component repair shop. If you have 1750 hours on a number 1 nozzle in a Jet Ranger, it probably does not flow very well. The number 1 nozzle is right next to the flame so it takes a lot of abuse. There are some PMA nozzles which are pretty good and a lot cheaper than RR nozzles. All Model 250 engines have a GP support. The GP support contains the number 1 and 2 wheels. Technically, if you are only doing a hot section, you can remove the hot section and send it in for overhaul or exchange without sending in the entire turbine, however the safe but more expensive route is to send the entire turbine section in.
diethelm is offline  
Old 19th Jun 2005, 13:02
  #13 (permalink)  
 
Join Date: Mar 2002
Location: Iceland
Age: 58
Posts: 814
Received 1 Like on 1 Post
Thanks diethelm

I didnt realise that the containment ring might already be installed but of course it could be.. Iīll check first thing monday

Ok now I'm starting to understand this deal abour the gas producer support the AD refers to.. so itīs not actually a new support but rather a modification to an existing one. got it now : )


I have all the overhaul/parts costs from the Airworthiness Directive, I have not been quoted yet, by a repair shop.
Aesir is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.