Commercial (Part 135) Single Engine IFR operations

Thread Starter
Join Date: Aug 2016
Location: Miami
Posts: 2

Which countries allow commercial single engine IFR operations?
If you have a link to the specific rule and criteria that would be most helpful.
Thank you!!
If you have a link to the specific rule and criteria that would be most helpful.
Thank you!!
Join Date: Dec 1998
Location: Escapee from Ultima Thule
Posts: 4,273
You specifically mention Part 135 ops. Do you mean 14CFR Part 135? ie USA. Or one of the other jurisdictions in the world that also name their charter regulations as 'Part 135'**
In the USA, S/E IFR 135 is permitted under 14CFR Part 135. Can be turbine or piston.
When I worked in Oz, the equivalent of 14CFR Part 135 ('Charter' in Oz) under IFR using single engine *turbine* was introduced - but not piston - for pax. However piston IFR charter was fine for freight.
Similarly for the UK when I worked there.
**doesn't mean they're the same rules though.
In the USA, S/E IFR 135 is permitted under 14CFR Part 135. Can be turbine or piston.
When I worked in Oz, the equivalent of 14CFR Part 135 ('Charter' in Oz) under IFR using single engine *turbine* was introduced - but not piston - for pax. However piston IFR charter was fine for freight.
Similarly for the UK when I worked there.
**doesn't mean they're the same rules though.