Go Back  PPRuNe Forums > Wannabes Forums > Professional Pilot Training (includes ground studies)
Reload this Page >

Hour building - UK PPL holder in EASA-land?

Wikiposts
Search
Professional Pilot Training (includes ground studies) A forum for those on the steep path to that coveted professional licence. Whether studying for the written exams, training for the flight tests or building experience here's where you can hang out.

Hour building - UK PPL holder in EASA-land?

Thread Tools
 
Search this Thread
 
Old 10th Jul 2023, 21:38
  #1 (permalink)  
Thread Starter
 
Join Date: Sep 2012
Location: London
Posts: 160
Likes: 0
Received 0 Likes on 0 Posts
Hour building - UK PPL holder in EASA-land?

Hello,

Is anyone currently in a situation similar to this one:
  • UK PPL(A) held
  • enrolled on a CPL+ME+IR combo in Poland (Bartolini Air/Smart Aviation/other)
  • with 150 hours TT required to start CPL but still short of required PIC minimum for licence issue
  • facing a problem now as ideally would like to fly remaining hours without returning from Poland to the UK just for that purpose, but no G-reg aircraft around?
/h88
hegemon88 is offline  
Old 11th Jul 2023, 05:15
  #2 (permalink)  
 
Join Date: Dec 2005
Location: Wherever I lay my hat
Posts: 4,011
Received 34 Likes on 14 Posts
Why not fly a Polish one?
rudestuff is offline  
Old 11th Jul 2023, 06:44
  #3 (permalink)  
Thread Starter
 
Join Date: Sep 2012
Location: London
Posts: 160
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by rudestuff
Why not fly a Polish one?
Good question. And the answer is: due to not being adequately licenced.

Some people take advantage (quite rightly so) of point E.2 of the Appendix 3 to Part-FCL, which only requires an ICAO-compliant PPL(A) licence at start of the modular CPL(A), and come to EASA-land with a UK Part-FCL PPL(A). That licence no longer allows you to fly EASA-registered aircraft.

Yes, there is a 28-day validation route provided by Commission Delegated Regulation (EU) 2020/723, but here's a catch: if it's Poland we're talking about, any non-standard issue, topic, application etc. will puzzle ULC (Polish NAA) so badly, that it will take months for them to respond and approve. It may be simpler and quicker for the UK PPL(A) holder to fly home and finish off the 20-30 PIC hours there.

I am talking about a "lacking 20-30 PIC hours, nearly finished training, skill test booked in three weeks' time, need a G-reg plane somewhere in Poland, and quickly" scenario.
hegemon88 is offline  
Old 11th Jul 2023, 09:02
  #4 (permalink)  
 
Join Date: Aug 2010
Location: Somewhere
Posts: 1,317
Received 0 Likes on 0 Posts
Originally Posted by hegemon88
Good question. And the answer is: due to not being adequately licenced.

Some people take advantage (quite rightly so) of point E.2 of the Appendix 3 to Part-FCL, which only requires an ICAO-compliant PPL(A) licence at start of the modular CPL(A), and come to EASA-land with a UK Part-FCL PPL(A). That licence no longer allows you to fly EASA-registered aircraft.

Yes, there is a 28-day validation route provided by Commission Delegated Regulation (EU) 2020/723, but here's a catch: if it's Poland we're talking about, any non-standard issue, topic, application etc. will puzzle ULC (Polish NAA) so badly, that it will take months for them to respond and approve. It may be simpler and quicker for the UK PPL(A) holder to fly home and finish off the 20-30 PIC hours there.

I am talking about a "lacking 20-30 PIC hours, nearly finished training, skill test booked in three weeks' time, need a G-reg plane somewhere in Poland, and quickly" scenario.
This really begs the question as to why you started the course without the required hours!?
Contact Approach is offline  
Old 11th Jul 2023, 09:49
  #5 (permalink)  
 
Join Date: Jul 2023
Location: London
Posts: 3
Likes: 0
Received 0 Likes on 0 Posts
Hey, let me understand.
You got a ppl from the uk and then went to fly EASA planes in Europe without an EASA license?
cacho22 is offline  
Old 12th Jul 2023, 12:23
  #6 (permalink)  
Thread Starter
 
Join Date: Sep 2012
Location: London
Posts: 160
Likes: 0
Received 0 Likes on 0 Posts
What made you keyboard warriors think that this is about me? I simply asked "Is anyone currently in a situation similar to this one", RTFQ!

I run a flying club and DTO in Poznań (EPPO) and we get inquiries from pilots in the situation I described. We happen to have PA28s which haven't been moved from G- to SP- yet and I am currently considering my next steps. Moving to SP- can be done as planned, or I could leave one PA28 on G- in case such inquiries become regular. We have already saved a few UK PPL(A) holders in that scenario. All I wanted to achieve here was to get a feel if further demand is likely.

You can laugh and joke all you want, but I for one can see added value for commercial students coming to Poland in being able to start the training sooner and completing the hour building in the meantime while bashing the sim in the "big school".

This is the PA28 whose fate is to be decided:



G-BPDT at EPPO apron #1
hegemon88 is offline  
Old 12th Jul 2023, 12:54
  #7 (permalink)  
 
Join Date: Jul 2023
Location: London
Posts: 3
Likes: 0
Received 0 Likes on 0 Posts
Thanks for your answer, and..first, I would never dare to laugh at you, nor to anyone else. I'm here to get advice and to learn.

I was just trying to understand what your situation was because I thought I was in a similar one.

I currently hold a PPL from the UK and when making my finances right, I'm afraid that I will never get to the 150 Hours to start my CPL UK training.

At a rate of £170 per hour in a C152 (fuel and other costs included) I will need around £25,500 to get those hours in the air, which at today's exchange rate is EUR30,000.

Therefore, I was thinking to make most of the hours in a cheaper place, like Poland. In this case there would be two possible escenarios:

a. I convert my UK PPL license into an EASA polish license. One "hour builder" provider from Poland told me that this costs EUR1000 and takes around 48 hours. (is it credible?)
b. I would need to fly an UK registered plane which should be maintained to UK CAA standars (Mechanics, anual, and so), so again I'm not sure how feasible, and cheap, is that in a country that is miles away from the UK.

Going back to your query, if you comply with b. then I might be very interested in what you have to offer

Thanks

p.s: check hour-building in Spain on google. (apparently I'm not allowed to post urls)
cacho22 is offline  
Old 13th Jul 2023, 07:08
  #8 (permalink)  
Thread Starter
 
Join Date: Sep 2012
Location: London
Posts: 160
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by cacho22
Thanks for your answer, and..first, I would never dare to laugh at you, nor to anyone else. I'm here to get advice and to learn.

I was just trying to understand what your situation was because I thought I was in a similar one.
So the joke is on me! I misunderstood what you have written and why, my apologies

Originally Posted by cacho22
I currently hold a PPL from the UK and when making my finances right, I'm afraid that I will never get to the 150 Hours to start my CPL UK training.
You seem to have budgeted for the whole 150 hours, but remember that you already have at least 47 hours from your PPL training and skill test. Roughly speaking, you are probably 100ish hours short of your CPL start requirement.

Originally Posted by cacho22
I would need to fly an UK registered plane which should be maintained to UK CAA standars (Mechanics, anual, and so), so again I'm not sure how feasible, and cheap, is that in a country that is miles away from the UK.
I am not only a dual-licenced pilot, but also a dual-licenced mechanic and I certify the work carried out on our G-reg aircraft, so it's all in hand.

Please stay in touch, perhaps we will be able to help.

/h88
hegemon88 is offline  
Old 13th Jul 2023, 10:17
  #9 (permalink)  
 
Join Date: Dec 2005
Location: Wherever I lay my hat
Posts: 4,011
Received 34 Likes on 14 Posts
Originally Posted by cacho22
Thanks for your answer, and..first, I would never dare to laugh at you, nor to anyone else. I'm here to get advice and to learn.

I was just trying to understand what your situation was because I thought I was in a similar one.

I currently hold a PPL from the UK and when making my finances right, I'm afraid that I will never get to the 150 Hours to start my CPL UK training.

At a rate of £170 per hour in a C152 (fuel and other costs included) I will need around £25,500 to get those hours in the air, which at today's exchange rate is EUR30,000.

Therefore, I was thinking to make most of the hours in a cheaper place, like Poland. In this case there would be two possible escenarios:

a. I convert my UK PPL license into an EASA polish license. One "hour builder" provider from Poland told me that this costs EUR1000 and takes around 48 hours. (is it credible?)
b. I would need to fly an UK registered plane which should be maintained to UK CAA standars (Mechanics, anual, and so), so again I'm not sure how feasible, and cheap, is that in a country that is miles away from the UK.

Going back to your query, if you comply with b. then I might be very interested in what you have to offer

Thanks

p.s: check hour-building in Spain on google. (apparently I'm not allowed to post urls)
1. No one should be paying much more than £100 per hour to hour build. For that money you can join a non-equity group in the UK or buy a block of 100+ hours in the US including flights and accommodation.
2. Your next target should not be the CPL - it should be 50 hours cross country then the IR - assuming you're intending on flying commercially.
rudestuff is offline  
Old 13th Jul 2023, 16:09
  #10 (permalink)  
 
Join Date: Aug 2010
Location: Somewhere
Posts: 1,317
Received 0 Likes on 0 Posts
Originally Posted by hegemon88
So the joke is on me! I misunderstood what you have written and why, my apologies



You seem to have budgeted for the whole 150 hours, but remember that you already have at least 47 hours from your PPL training and skill test. Roughly speaking, you are probably 100ish hours short of your CPL start requirement.



I am not only a dual-licenced pilot, but also a dual-licenced mechanic and I certify the work carried out on our G-reg aircraft, so it's all in hand.

Please stay in touch, perhaps we will be able to help.

/h88
You come across as fairly hostile, might help your cause if you tweak it somewhat.
Contact Approach is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.