Essendon Runway Works
Thread Starter
Essendon Runway Works
Tulla refueller tells me that YMEN, is closing next year for a four to six week period so that runway 08/26 can be resurfaced and the Melbourne north -south water main which crosses 17/35 needs to be replaced.
Talk of corporate jets to Avalon, air ambulance moving up to Tulla and the rest moving down to Point Cook.
Talk of corporate jets to Avalon, air ambulance moving up to Tulla and the rest moving down to Point Cook.
Sprucegoose
Join Date: Sep 2000
Location: Hughes Point, where life is great! Was also resident on page 13, but now I'm lost in Cyberspace....
Age: 59
Posts: 3,485
Likes: 0
Received 1 Like
on
1 Post
Meh, A109s dont need runways anyway.
runway 08/26 can be resurfaced
Huge minus: ongoing unsustainable cash outflows guarantee early demise on economic grounds, put up a parking lot
I think Linfox are committed to both aviation and Essendon Airport. My guess would be that Melbourne water need to replace the main and Linfox have found a way to use that to get Melb Water & / or the government to subsidise a runway upgrade.
I'd view it as a positive thing.
I'd view it as a positive thing.