S-I LOC
Thread Starter
Join Date: Jul 2011
Location: Australia
Posts: 25
Likes: 0
Received 0 Likes
on
0 Posts
S-I LOC
Hi
Just looking at the PER Notam's and it has.
ILS or LOC Rwy 21 S-I LOC/DME MINIMA 550(507-2.0)
Could somebody please explain what the S-I stands for please.
newifr
Just looking at the PER Notam's and it has.
ILS or LOC Rwy 21 S-I LOC/DME MINIMA 550(507-2.0)
Could somebody please explain what the S-I stands for please.
newifr
Join Date: Jun 2010
Location: Aus
Age: 55
Posts: 34
Likes: 0
Received 0 Likes
on
0 Posts
Aip dep and apch (dap) east ybbn amd
ils or loc rwy 01 s-i loc/dme minima 560(547-2.2)
ils-z or loc-z rwy 19 effective 28jun12 s-i loc/dme minima
410(397-1.3)
ils-y or loc-y rwy 19 effective 28jun12 s-i loc/dme minima
410(397-1.3)
from 06 070431 to per
ils or loc rwy 01 s-i loc/dme minima 560(547-2.2)
ils-z or loc-z rwy 19 effective 28jun12 s-i loc/dme minima
410(397-1.3)
ils-y or loc-y rwy 19 effective 28jun12 s-i loc/dme minima
410(397-1.3)
from 06 070431 to per
You'll note its for the 28JUN cycle. There has recently been a change in the way visibility for LOC procedures can be calculated, and as such the change has been implemented across the board for all LOC procedures.
In short you can include the length of HIAL in the calculation. Thus the vis can be reduced by the length of HIAL available.
In short you can include the length of HIAL in the calculation. Thus the vis can be reduced by the length of HIAL available.