what is one step down planning
Thread Starter
Joined: May 2005
Posts: 38
Likes: 0
From: mostly airborne
what is one step down planning
Hello guys, today I heard, that you have to plan an alternate in case of destination wx is below minimum at the eta with the one step down or one step below or one step under method. It shall mean, if there is at the alternate an precision apch (ils) and an e.g. vor apch you have to assure that the wx at eta (altn) is sufficient for an apch that is (with respect to precision) one step under the "best precision apch". is that correct? where can you read more about it? is it a law??
yours lusthansa!
yours lusthansa!
Joined: Feb 2006
Posts: 47
Likes: 0
From: occ
check the operations manual of your company or jar ops 1.255...

cheers
ralle
http://www.fct.ccoo.es/aereo/pdf/leg...s/jar-ops1.pdf

cheers
ralle
http://www.fct.ccoo.es/aereo/pdf/leg...s/jar-ops1.pdf
Joined: Jan 2007
Posts: 60
Likes: 0
From: Europe
To expand this topic further:
planning minima as follows:...
JAR-OPS 1.295 Selection of aerodromes states:
"(d) An operator must select two destination alternates when:
(1) The appropriate weather reports or forecasts for the destination, or any combination thereof, indicate that during a period commencing 1 hour before and ending 1 hour after the estimated time of arrival, the weather conditions will be below the applicable planning minima; or
(2) No meteorological information is available."
While JAR-OPS 1.297 Planning minima for IFRflights says:
"(b) Planning minima for destination and destination alternate aerodromes. An operator shall only select the destination aerodrome and/or destination alternate aerodrome(s) when the appropriate weather reports or forecasts, or any combination thereof, indicate that, during a period commencing 1 hour before and ending 1 hour after the estimated time of arrival at the aerodrome, the weather conditions will be at or above the applicable
"(d) An operator must select two destination alternates when:
(1) The appropriate weather reports or forecasts for the destination, or any combination thereof, indicate that during a period commencing 1 hour before and ending 1 hour after the estimated time of arrival, the weather conditions will be below the applicable planning minima; or
(2) No meteorological information is available."
While JAR-OPS 1.297 Planning minima for IFRflights says:
"(b) Planning minima for destination and destination alternate aerodromes. An operator shall only select the destination aerodrome and/or destination alternate aerodrome(s) when the appropriate weather reports or forecasts, or any combination thereof, indicate that, during a period commencing 1 hour before and ending 1 hour after the estimated time of arrival at the aerodrome, the weather conditions will be at or above the applicable
planning minima as follows:...
"
So, I read this many times and I still do not understand
if we have to have fuel for new (provisional) destination where the weather is good + alternates for provisional destination or fuel for original destination (with bad wx) + 2 alternates.
if we have to have fuel for new (provisional) destination where the weather is good + alternates for provisional destination or fuel for original destination (with bad wx) + 2 alternates.If anybody could clear this for me I would appreciate it very much
Joined: Jan 2007
Posts: 60
Likes: 0
From: Europe
To expand this topic further:
planning minima as follows:...
JAR-OPS 1.295 Selection of aerodromes states:
"(d) An operator must select two destination alternates when:
(1) The appropriate weather reports or forecasts for the destination, or any combination thereof, indicate that during a period commencing 1 hour before and ending 1 hour after the estimated time of arrival, the weather conditions will be below the applicable planning minima; or
(2) No meteorological information is available."
While JAR-OPS 1.297 Planning minima for IFRflights says:
"(b) Planning minima for destination and destination alternate aerodromes. An operator shall only select the destination aerodrome and/or destination alternate aerodrome(s) when the appropriate weather reports or fore-casts, or any combination thereof, indicate that, during a period commen-cing 1 hour before and ending 1 hour after the estimated time of arrival at the aerodrome, the weather conditions will be at or above the applicable
"(d) An operator must select two destination alternates when:
(1) The appropriate weather reports or forecasts for the destination, or any combination thereof, indicate that during a period commencing 1 hour before and ending 1 hour after the estimated time of arrival, the weather conditions will be below the applicable planning minima; or
(2) No meteorological information is available."
While JAR-OPS 1.297 Planning minima for IFRflights says:
"(b) Planning minima for destination and destination alternate aerodromes. An operator shall only select the destination aerodrome and/or destination alternate aerodrome(s) when the appropriate weather reports or fore-casts, or any combination thereof, indicate that, during a period commen-cing 1 hour before and ending 1 hour after the estimated time of arrival at the aerodrome, the weather conditions will be at or above the applicable
planning minima as follows:...
"
So, I read this many times and I still do not understand
if we have to have fuel for new (provisional) destination where the weather is good + alternates for provisional destination or fuel for original destination (with bad wx) + 2 alternates.
if we have to have fuel for new (provisional) destination where the weather is good + alternates for provisional destination or fuel for original destination (with bad wx) + 2 alternates.If anybody could clear this for me I would appreciate it very much
Per Ardua ad Astraeus
Joined: Mar 2000
Posts: 18,575
Likes: 4
From: UK
JAR-OPS 1 Subpart D,
JAR-OPS 1.297(b)(2) (continued)
Circling......................................Circling
Page 1-D-8 in my copy.
JAR-OPS 1.297(b)(2) (continued)
Table 1 Planning minima – En-route and destination alternates
Type of approach........................Planning Minima
Cat II and III..............................Cat I (Note 1)
Cat I.........................................Non-precision (Notes 1 & 2)
Non-precision.............................Non-precision (Notes 1 & 2) plus 200 ft/1 000m
Circling......................................Circling
Page 1-D-8 in my copy.




