The rumour mill grinds on......
It appears that rwy 27/09 will be shut, mon-fri, for at least a month from mid-July. This is in order to remove the large hump/dip in the rwy and improve drainage. This in turn should increase braking ability (v.useful to larger biz jets that seem determined not to backtrack after rollout on 09!). In the process the width of 27/09 will also be reduced to 30m, from the 37m it currently is.
The plan, I believe, is to allow light GA operations on 22/04 and 18/36 during the week, and any jet traffic will operate on 27/09 on the weekend, until the works are complete.
It appears that rwy 27/09 will be shut, mon-fri, for at least a month from mid-July. This is in order to remove the large hump/dip in the rwy and improve drainage. This in turn should increase braking ability (v.useful to larger biz jets that seem determined not to backtrack after rollout on 09!). In the process the width of 27/09 will also be reduced to 30m, from the 37m it currently is.
The plan, I believe, is to allow light GA operations on 22/04 and 18/36 during the week, and any jet traffic will operate on 27/09 on the weekend, until the works are complete.
Join Date: Feb 2004
Location: West Midlands
Posts: 242
Likes: 0
Received 0 Likes
on
0 Posts
Look on the bright side. Beef up the runway and some lo-cost chappies will be in there like rats up drain pipes to provide the local population with cheap services to places they never considered going to!
Thread Starter
Join Date: Jan 2004
Location: At the end of the Met line
Posts: 163
Likes: 0
Received 0 Likes
on
0 Posts
cb9002:
From what I gather, the whole circus is going to cost enough without having to repave a 37m wide runway, so it will be narrowed. Possibly something to do with drainage as well.
From what I gather, the whole circus is going to cost enough without having to repave a 37m wide runway, so it will be narrowed. Possibly something to do with drainage as well.
Join Date: Jul 2000
Location: Santa
Posts: 16
Likes: 0
Received 0 Likes
on
0 Posts
Gloucestershire Airport
The idea behind “beefing it up” may be to provide extra hardcore for when they bulldoze the whole lot and put houses on it
(Ref: - local rag, last week - or is that just an example of more quality UK Journalism)
(Ref: - local rag, last week - or is that just an example of more quality UK Journalism)
Join Date: Feb 2001
Location: UK
Posts: 588
Likes: 0
Received 0 Likes
on
0 Posts
The operators were advised on Tuesday that 09/27 would be shut Mon-Fri from 2nd August for 3 weeks, the remainder of the work being carried out overnight during the last week of the month.
The 30m width brings the runway into line with the Code 2 Licensing criteria and, of course, reduces ongoing costs. The existing 'shoulders' will remain however and the 'hump' will be removed.
Chilli
It's not the size, it's what you do with it that counts...and your hump is much bigger than ours!!!
The 30m width brings the runway into line with the Code 2 Licensing criteria and, of course, reduces ongoing costs. The existing 'shoulders' will remain however and the 'hump' will be removed.
Chilli
It's not the size, it's what you do with it that counts...and your hump is much bigger than ours!!!
PPRuNe Knight in Shining Armour
Join Date: Feb 2000
Location: Everywhere in the UK, but not home!
Posts: 503
Likes: 0
Received 0 Likes
on
0 Posts
So, is the hump being removed, or the dip being filled in, or perhaps both?
Does this mean that the airfield QNH and threshold QNH are going to be the same now? That's always a pain to explain to the studes.
I shall also look forward to some smoother landings on 09 now, never again having to explain to the studes, "yes you did flare at the right height, it's just that the runway drops away from underneath you, next time try landing on the numbers!!"
Does this mean that the airfield QNH and threshold QNH are going to be the same now? That's always a pain to explain to the studes.
I shall also look forward to some smoother landings on 09 now, never again having to explain to the studes, "yes you did flare at the right height, it's just that the runway drops away from underneath you, next time try landing on the numbers!!"
Join Date: Oct 1999
Location: Anywhere
Posts: 2,212
Likes: 0
Received 0 Likes
on
0 Posts
Snigs
I really hope you mean QFE
Matspart3
Think yourself lucky you're off for 4 days - I was going to come up and abuse you for that one
Anyways - ours isn't a hump - it's a ski-jump!
Does this mean that the airfield QNH and threshold QNH are going to be the same now? That's always a pain to explain to the studes.
Matspart3
It's not the size, it's what you do with it that counts...and your hump is much bigger than ours!!!
Anyways - ours isn't a hump - it's a ski-jump!
Guest
Join Date: Apr 2003
Posts: 876
Likes: 0
Received 0 Likes
on
0 Posts
Thanks very much but keep that hump where it is... I believe I am the owner of that one!!!
Chilli Monster when will you be in NCE next?
Mastpart3, I should be in GOS sometimes in July, fancy a beer (the ex expat has invited me before his house becomes teo crowded)
Snigs... How s the job hunting?
Chilli Monster when will you be in NCE next?
Mastpart3, I should be in GOS sometimes in July, fancy a beer (the ex expat has invited me before his house becomes teo crowded)
Snigs... How s the job hunting?
Guest
Join Date: Apr 2003
Posts: 876
Likes: 0
Received 0 Likes
on
0 Posts
Nasib, you should know that I don't need a 75 to make holes in runways.... A PA28 or a seneca is plenty enough for me. Coupled with a high flare and the greatest feeling of all.... The sinking feeling!!!
Snigs, i ll let u know when I am at BRS and yes you can buy me a beer
Snigs, i ll let u know when I am at BRS and yes you can buy me a beer
PPRuNe Knight in Shining Armour
Join Date: Feb 2000
Location: Everywhere in the UK, but not home!
Posts: 503
Likes: 0
Received 0 Likes
on
0 Posts
I notice with the usual consternation that AMEX's hump is still there!!
What's the reason why the work hasn't been done? Is the rumoured takeover by a private concern something to do with it per chance?
What's the reason why the work hasn't been done? Is the rumoured takeover by a private concern something to do with it per chance?