Go Back  PPRuNe Forums > PPRuNe Worldwide > Australia, New Zealand & the Pacific
Reload this Page >

The Big Merged QF Engineering Thread

Wikiposts
Search
Australia, New Zealand & the Pacific Airline and RPT Rumours & News in Australia, enZed and the Pacific

The Big Merged QF Engineering Thread

Thread Tools
 
Search this Thread
 
Old 28th Oct 2007, 06:28
  #21 (permalink)  
 
Join Date: Jun 2006
Location: Melbourne
Posts: 305
Likes: 0
Received 0 Likes on 0 Posts
The Forstaff ship sails into Tulla on monday

all mercenaries aboard I'm told but only one LAME among them mmmmm now I'm suspicious either the LAMEs are no longer spineless or this deals stinks to high heaven

what are the allowances are they award ?
The Mr Fixit is offline  
Old 28th Oct 2007, 08:25
  #22 (permalink)  
 
Join Date: Jan 2005
Location: Stralya
Posts: 577
Likes: 0
Received 0 Likes on 0 Posts
The pooorly crafted yet widely "spun" tapestry is beginning to unravel across the company....

Scary thing is management think J* will fix any ill!
QFinsider is offline  
Old 28th Oct 2007, 11:34
  #23 (permalink)  
 
Join Date: Mar 2006
Location: Melbourne
Posts: 472
Likes: 0
Received 0 Likes on 0 Posts
Allowances , are they award?

The allowances are not as per the agreement. In fact, Qantas and Forstaff have offered less than the agreement to go to Tulla. The Forstaff EBA is specific in the terms to apply in this case and yet less is offered because they feel that the agreed rate is too much.
The staff going to Tulla must be really keen to escape working at Avalon. The offered rate is kicked up to a sizable amount if you live at Geelong as it's boosted by a travelling allowance, so most of those going live at Geelong or Lara.
What is ludicrous is that the ALAEA and the AWU has told them that they are being underpaid, yet these bunnies accept less anyway.
So begs the question. Why would anyone undermine the agreement by accepting less than the agreed rate? The answer is that they are not members of any union and don't care what happens at any establishment, just so long as they get THEIR money (which will gradually reduce as the managements get their way).
AEROMEDIC is offline  
Old 28th Oct 2007, 19:28
  #24 (permalink)  
 
Join Date: Aug 2007
Location: Sydney
Age: 54
Posts: 192
Likes: 0
Received 0 Likes on 0 Posts
how many of these are from across the ditch,i'd bet most if not all.
employes perspective is offline  
Old 30th Oct 2007, 00:39
  #25 (permalink)  
K9P
 
Join Date: Mar 2006
Location: Australia
Posts: 100
Likes: 0
Received 0 Likes on 0 Posts
I feel that Qantas Engineering Management and those above perceive those on the hangar floor with maintenance skills as a necessary evil which drives down their profits, and therefore look on those people with utter contempt.
In my humble opinion, they thought they could successfully de-skill Qantas Engineering and find slots for their aircraft O/S.
This of course backfired, due to a lack of experience in aviation planning, we all know that new aircraft never meet their target delivery date, so you have to keep maintaining your old crates.
Then there's training for the new aircraft. When is that all going to happen?
There's my two cents worth....................

P.S. One of the Planning Managers from Qantas came down to Avalon and gave a presentation for their Exell Award, he told us that he received an e-mail from "Geoff" to say how well we had done, presented a couple of LED booklamps and we all got an apple, apiece of mudcake and, wait for it, a biscuit in it's own special little box. If that ain't contempt......What is?

Last edited by K9P; 30th Oct 2007 at 00:52.
K9P is offline  
Old 5th Nov 2007, 10:07
  #26 (permalink)  
 
Join Date: Feb 2005
Location: Here
Posts: 122
Likes: 0
Received 0 Likes on 0 Posts
Luxury
All we ever got in Sydney Heavy was a box of donuts to share.
We used to dream of an apple and mudcake!
And a biscuit was beyond our wildest dreams.

In the end all we got was in fact DONUT.
No SAR No Details is offline  
Old 5th Nov 2007, 11:18
  #27 (permalink)  
 
Join Date: Jul 2003
Location: Oz
Posts: 903
Received 16 Likes on 12 Posts
The demise of QF heavy engineering started as far back as 1998 when PAcer and SUPERQIK were shutdown and replaced with CAMSYS. Av part of the process, the production planning dept on M189/1 was disbandoned.

These guys had up to 40 years experiance and knew intimately what was going to be needed for any phase check, and with consultation of the relevent engineers meant there were allways the required parts on the shelf, WHEN they were needed. Stores allways carried enough parts in stock to enable aircraft to get out in time.

When production planning in SYD was disbandoned in 98, it was sent down to Melbourne where unskilled clerks did the same job, none had any aircraft or aviation knowledge.

The results speak for them selves.

I was there from 90 to 98.
nomorecatering is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.