PDA

View Full Version : Futher With The Glide


King of the Beet Lowlands
12th Dec 2003, 06:45
A quick question.

On being vectored onto the ILS often we get a clearance on the lines of "XXX descend 2500', turn right heading 200, report established on the localiser, futher descent with the gilde".

As far as I am aware the ".....futher with the glide" bit is non-standard R/T and leads to some confusion as to its meaning. I think it can be interpreted two ways. Firstly, once established on the localiser cleared for the glideslope. Secondly, the altitude given is the lowest descent, and EXPECT the next lunge toward the earth to be with the glideslope.

So,

1, Is "futher with the glide" recognised R/T? If so what does it mean?

2, If it isn't (and this particuarly applise to MAN APP controllers) what do you mean by it?

If you mean the first meaning, how about use, ".....once established on the localiser cleared for the glideslope".

If you mean the second meaning, you could try, ".....expect futher with the glide".

I think this would remove any ambiguity used by an otherwise excellent group of controllers.

Thanks.

P.S. This is not meant to be a discussion of the rights and wrongs of the UK's system of clearing for the localiser and then glideslope, I'm just trying to make my day go more easily.

Bern Oulli
12th Dec 2003, 14:37
The short answer is "No", it is not standard R/T phraseology as per MATS Pt 1. I would severely beat a student with a flight progress strip-holder for saying that. It is ambiguous as you say. Some other countries use the phrase "cleared ILS approach, report established", which clears you for the whole approach, including the descent on the glidepath. In the UK we do not. The following format is the preferred (and taught) method:-

engage instructor mode
"Callsign turn right heading 230, closing the localiser from the right, X miles from touchdown, report established."

When the aircraft reports established (on the localiser) "Descend on the ILS, QNH is xxxx, airfield elevation xyz feet". Distance from touchdown may be included.

Standard phraseology may not sound "cool" to those who watch too many movies, but everybody stands a fighting chance of getting the right message first time. Final approach is no time to start a debate on the flight deck about what the controller meant by that instruction.

instructor mode to standby

flower
12th Dec 2003, 16:20
Regarding the instructor mode and this is not a go at Bern Ouilli but at a number of instructors and MATS part1 backs me up on this.
There is no need to give airfield elevation if it is already published, neither is there a need for a range from touchdown when established if there is a fully serviceable DME and why do people still insist on saying closing the localiser from the right or left.
Grrrr imagine if they said that at Heathrow Gatwick etc
Anyhow rant over

I do use the phrase further descent with the glide from time to time, sorry I didn't realise it would be ambiguous.
Basically what I am saying to the aircraft is they will not get any further descent from me until they are established so don't ask for any ( I usually descend the aircraft to platform height anyway)
Or I may clarify it by saying something like you may continue your descent with the glide path if for example I am I think a little high and want the aircraft to start his descent and he is on a closing heading to establish.
Maybe its not MATS part 1 but it has been taught to me that way at 3 separate radar units

TC_LTN
12th Dec 2003, 16:44
I use "When established on the localiser, descend on the ILS" which I find quite useful on occasions.

Jerricho
12th Dec 2003, 16:54
Some units have incorporated the "further with the glide path" (TC for one) into their local MATS Part 2. However, that as well is an abridged version of the correct phraseology.

"......when established on the localiser, further descent with the glide path" is used, especially during a busy sequence, and eliminates the situation of a pilot waiting, waiting, waiting to get in on the r/t to confirm they can descend further. The reason, take EGLL for example. Especially on 27, with the helicopter routes over the city, if an a/c is descending on the glide path, it is separated from the standard alititudes on the routes. Also, as our usual descent is to 4000' (as EGLC uses 3000' below us), once again, if established and descend on the G.P., the descent from 4000' at about 12 miles is also separated.

As an aside for a point of discussion, why is there the requirement for the good old "turn left heading ..., REPORT localiser established Rwy ...". I'm looking at the radar, I can see if they have established or gone through. I have never really seen the point. What's wrong with "turn left to intercept localiser Rwy..."? And I'm with Flower with the "range from touchdown" issue for straight in/on the ILS. If the driver can't get a DME range, they'll tell you and ask for it (we'll not go into the closing the localiser from the left/right!)

TC_LTN
12th Dec 2003, 17:11
Jerricho

I couldn't find any concession in the TC P2 to use aything other than the P1 phraseology, just a reminder in the Gen section that "When established on the localiser, descend on the ILS" as stated in P1 was available to use?

Perhaps you could point me in the direction of the reference to "further with the glide path".

brimstone
12th Dec 2003, 19:21
Hello J - the reason we ask pilots to report established on the localiser is because that is the prompt for us then to issue clearance to descend on the ILS.

If that report is not forthcoming because it has not been requested, then unless conditional clearance to descend on the ILS has already been given, the controller would have to ask the pilot if he is established before giving further descent.

I know that you can see the aircraft turn onto the localiser but according to my interpretation of the Pt 1, that is not sufficient.

RTO - this has been debated before. The reason why in the UK we are not permitted to say "cleared ILS" when radar vectoring to an ILS approach is that pilots have taken such a clearance as permission to descend to the altitude at which the approach commences according to the Approach Chart, irrespective of their previously cleared altitude. In the case of Heathrow the ILS/DME approaches commence at 2500ft. An aircraft descending to 2500ft say 15 miles from touchdown on an ILS to 27L/R runs the risk of encountering other aircraft operating up to 3000ft.

:confused: :confused:

tori chelli
12th Dec 2003, 19:39
With deepest respect to Bern Oulli, the MATS Pt1 does now allow "turn left/right heading xxx report localiser established" in addition to the more verbose traditional phrase.

I suspect "further with the glide" is an abridged version of the conditional descent on the ILS which is also now permitted by the MATS Pt1...sloppy R/T, but not an incorrect procedure.

Tori
always under pressure

Jerricho
12th Dec 2003, 23:35
Hey TC_Ltn,

I'm sure it was in there. I'll have a hunt about for it next week. I know the EGLL LCEs encourage it, so it must have come form somewhere.

Hammy, you floating about today? Where did it come from?

HAMMY
13th Dec 2003, 00:12
Good evening all.TC_LTN is quite correct,that is the phraseology we should all be using.The "when established on the localiser descend with the glidepath" is a mixture of the old and new phraseology and therefore should not be used.
The new phraseology was brought in to stop a/c being cleared for the ILS say 14 miles out and descending down to the lowest level at which the procedure starts straight away(which is why before the new phraseology we used the descend on the glidepath bit).I think there may have been an incident at some point or other that brought in the new phrase.
J see you later

Jerricho
13th Dec 2003, 00:16
No wonder I get hammered in my checks for my phraseology!

Bern Oulli
13th Dec 2003, 00:57
TC_LTNNothing wrong with that phrase that you use, it is in the MATS Appendix E.

I would caution a student however, that this instruction should not cause the aircraft to commence descent using the glidepath signal if outside the glidepath protected range - i.e. the aircraft established on the localiser at a level above 3,000 aal (normally).

My point was, in the main, that nowhere in the phraseology part of the MATS Pt1 does the word "glide" or "glidepath" appear, in the context of vectoring for an ILS approach. And anyway, surely one descends on a glidepath, not with a glidepath. As for "further with the glide", well, that just does not make grammatical sense.

As to whether the phraseology is too verbose for the traffic loading at some units, or should be brought into line with our continental friends, is an entirely different matter.

I grant you that distance from touchdown is not mentioned in the Phraseology bit, but I would have thought that was covered in Section 3 Chapter 2 Page 2 Para 9:

9.1 The position of an aircraft is to be passed to the pilot at least once on each leg of the circuit.

9.2 Position information for an aircraft making a straight-in approach is to be passed at least once before it commences the final descent.

Distance from touchdown, on a closing heading, constitutes position information, in my humble submission.

Herewith the sum total of phrases for use when turning an aircraft onto the localiser for an ILS approach (according to Appendix E):

Turn left/right heading (three digits, report established on the localiser.

Closing the localiser from the left/right; report established.

Descend on the ILS, QFE (pressure) millibars.

Descend on the ILS, QNH (pressure) millibars, elevation (number) feet.

When established on the localiser, descend on the ILS, QFE (pressure) millibars/QNH (pressure) millibars, Elevation (number) feet.

Now, controversial thought, perhaps the MATS needs to catch up with reality?

flower
13th Dec 2003, 01:10
MATS PT 1 Catching up with reality , now theres a thought. You will be suggesting the College of ATC does the same next !!

Jerricho
13th Dec 2003, 01:22
I don't know what you're talking about Flower.;)

1261
13th Dec 2003, 02:00
I have to admit that to avoid unnecessary calls when busy I've started to just say "Cleared ILS Approach 24" [with the closing turn] to foreign crews - I still do that MATS 1 thing to the Brits (MATS 1 1-1-1.2 applies). And, no, it has never caused any confusion!
However, almost all aircraft under radar vectors at our unit will be at the platform level for the approach before commencing their closing turn in any case, so the pre-emptive descent worry doesn't apply.

backofthedrag
13th Dec 2003, 02:03
As a pilot, unless on a long final (perhaps westerlies at LHR), I often try to intercept the localiser and the glidepath at the same time. This avoids noisy level flight and at LGW and MAN with usually short base legs works very well as long as we can immediately get cleared to descend as we intercept the localiser.
Abroad, once cleared for the whole approach in one go, this is not an issue.
I realise that this is not an ATC issue, it is one of legislation, but it is frustrating to see that glide bug disappearing downwards whilst the frequency is occupied, knowing full well you would have been cleared anyway.
'Further descent on the glide' whilst on an intercept heading sorts out this problem and if you can't so clear someone, its a shame.

Yankee_Doodle_Floppy_Disk
16th Dec 2003, 06:01
greetings from Downunder.

If you want to clear someone to join the localiser only, and you wish to prevent them descending early, the phrase I would use in this part of the world is "JOIN THE LOCALISER, MAINTAIN 3000FT"

There would probably be an additional "DUE TRAFFIC" or whatever the reason was. Otherwise "CLEARED ILS/DME APPROACH RUNWAY 27" means maintain the current cleared level until able to descend in accordance with the procedure.

As an aside, is the Airfield Elevation published on the chart? How prevalent is the use of QFE in Britain?

ILS 119.5
16th Dec 2003, 08:15
The ambiguity here arises when an a/c is told told to intercept at a a certain altitude and report established this is not an instruction to decend on the g/p. An a/c must only decend when instructed either once established or after receiving the command "once established decend on the ILS" I know of a situation where a colleague of mine was told to report established at 4000ft, the a/c had been configured to decend once established, which it did. However this did not help when the controller realised that the a/c had left 4000ft with the glide against an opposite direction departure climbing to 3000ft. Technically a safe procedure, but in this instance not, owing to the pilot automatically assuming he was cleared to to decend once established. In my opinion a/c should not decend on the g/p without clearance to do so.

Timothy
16th Dec 2003, 15:04
JAAMOI, in smaller airfields in Russia and the CIS they clear you to descend on the slope to, say, 2,000', then to call. You are then handed over to TWR who give you futher descent.

This profile is, of course, impossible, so the only solution is to call 2000' at, say 3000', continue on the slope as you change freq, and then continue the descent regardless of what TWR says, but hoping that they will have cleared you below 2000' by the time you get there.

This probably explains why some CIS pilots seem to have the habit of calling level when they are still in the descent.

W

Bright-Ling
16th Dec 2003, 16:52
At some units the ILS can be intercepted but if a descent was taken it would take the aircraft out of controlled airspace. Therefore when an aircraft reports established on the LLZ we say "Maintain 4000ft - follow the localiser" and then "descend to altitude 3000ft, further descent with the ILS"

119.5 - with regard to opposite end departures against the flow of an inbound - I always let the inbound know to maintain 4000' with the reason "opposite direction departure climbing below you". Otherwise they will only ask toconfirm the landing runway....!

So easy to screw up when using both ends in a busy enviroment.

eyeinthesky
16th Dec 2003, 19:24
Three points, from an ATCO and Pilot point of view:

1) A/F Elevation. If you are going to give an elevation in this scenario, it should be the threshold elevation of the runway to which we are approaching, not the airfield elevation.

2) DME Range. Miles to touchdown when vectoring is useful to allow descent planning, and a DME check on clearance to intercept or descend on the glidepath is useful so I can check that my DME readout agrees with what the radar says. Remember that we use DME to check altitude vs glidepath during the approach (and the correct altitudes at certain DME are marked on the chart). If the DME is wrong, then we risk being at the wrong height at the wrong point, or going around because we suspect incorrect glidepath indications.

3) Use of QNH. Most airlines in the UK seem to use QNH for landing. They have their own reasons/SOPs for doing this. My reason is that the QNH-based figures are in bold type and easier to spot on the Thales charts, and they remove another need to reset an altimeter before landing or on the go-around.
Having said that, I use QFE if I'm doing bit of VFR flying or instructing at a local airfield. It removes the need for students to do mental calculations of Altitude minus A/F elevation to work out their height AGL whilst in the circuit.

I'm not an approach controller, but doesn't the 'Established Localiser' call give you the chance to check that they really ARE before they start to descend? One more link in the accident-prevention chain?

aluminium persuader
17th Dec 2003, 06:30
I'm sure we've been here before, but as I was taught:

"cleared ILS rwy xx" would clear you for a procedural approach - the full monty, initial approach fix, descent profile etc, viathe beacon you would holdat if necessary.

"closing the localiser" and all the rest belongs to a radar-vectored approach, and the biggest clue comes from the phrase "radar vectors ILS xx".

It could be argued that, at larger airports where a full procedural approach service would only be used as a last resort, this diffrentiation is unnecessary; however, imho there are still enough major airports who run procedural training (for pilots) in parallel with radar approaches plus those who run down to single-man full procedural services at night to keep it as is.

Please do not adjust your sets - normal service will be resumed shortly. Meanwhile, here is some music! :ok:

av8boy
18th Dec 2003, 01:26
I always thought there was a certain charm in taking a big breath, mashing the foot swith and saying...

Six miles from Limma turn left heading 270 maintain three thousand two hundred until established on the localizer cleared ILS runway 25L approach, two-and-a-quarter till the marker, fater if you like, as you roll out on the localizer you'll have traffic three o'clock and a mile, an Airbus for the right who has you in sight, contact tower 120.95 at Limma good day. Unkey. Big breath. Do it again.

Or is that a bit much?

:O

Dave

Scott Voigt
18th Dec 2003, 06:12
Dave;

That sounds a bit right for me <G>... Of course, there was always a few more traffic calls than that <G>... Don't forget the IDAHO orbiting over lima... Been there, done that...

regards

Scott

av8boy
18th Dec 2003, 06:26
You mean that Idaho that's not there? Kind of the "pay no attention to the man behind the curtain" deal... While we're chatting... this is something that I could never get a straight answer on: Did they settle on "Idaho" as a callsign because of the B-52's "Living in Your Own Private Idaho" or was that just coincidence? I've asked the chaps directly and nobody seemed to know.

Of course, it's not just Idaho. It's also the unrequested litany of calls from others doing the same thing... I clear Delta or whomever for the approach and mention copter traffic ahead and low, and out of the blue I get: "PD12's got the Delta." "PD3's got the Boeing in sight." "PD8's got the traffic," etc. I guess there's just something about the neighborhood...



Dave:D

Scott Voigt
19th Dec 2003, 11:03
Dave;

Well I was sitting right seat in that aircraft many, many years ago <G>... give me an e-mail at [email protected] and we can chat.

Scott