Go Back  PPRuNe Forums > Ground & Other Ops Forums > ATC Issues
Reload this Page >

Futher With The Glide

Wikiposts
Search
ATC Issues A place where pilots may enter the 'lions den' that is Air Traffic Control in complete safety and find out the answers to all those obscure topics which you always wanted to know the answer to but were afraid to ask.

Futher With The Glide

Thread Tools
 
Search this Thread
 
Old 12th Dec 2003, 06:45
  #1 (permalink)  
Thread Starter
 
Join Date: Mar 2002
Location: The Beet Lowlands - Obviously!!!
Posts: 8
Likes: 0
Received 0 Likes on 0 Posts
Futher With The Glide

A quick question.

On being vectored onto the ILS often we get a clearance on the lines of "XXX descend 2500', turn right heading 200, report established on the localiser, futher descent with the gilde".

As far as I am aware the ".....futher with the glide" bit is non-standard R/T and leads to some confusion as to its meaning. I think it can be interpreted two ways. Firstly, once established on the localiser cleared for the glideslope. Secondly, the altitude given is the lowest descent, and EXPECT the next lunge toward the earth to be with the glideslope.

So,

1, Is "futher with the glide" recognised R/T? If so what does it mean?

2, If it isn't (and this particuarly applise to MAN APP controllers) what do you mean by it?

If you mean the first meaning, how about use, ".....once established on the localiser cleared for the glideslope".

If you mean the second meaning, you could try, ".....expect futher with the glide".

I think this would remove any ambiguity used by an otherwise excellent group of controllers.

Thanks.

P.S. This is not meant to be a discussion of the rights and wrongs of the UK's system of clearing for the localiser and then glideslope, I'm just trying to make my day go more easily.
King of the Beet Lowlands is offline  
Old 12th Dec 2003, 14:37
  #2 (permalink)  
 
Join Date: Nov 1999
Location: Wivenhoe, not too far from the Clacton VOR
Posts: 319
Likes: 0
Received 0 Likes on 0 Posts
The short answer is "No", it is not standard R/T phraseology as per MATS Pt 1. I would severely beat a student with a flight progress strip-holder for saying that. It is ambiguous as you say. Some other countries use the phrase "cleared ILS approach, report established", which clears you for the whole approach, including the descent on the glidepath. In the UK we do not. The following format is the preferred (and taught) method:-

engage instructor mode
"Callsign turn right heading 230, closing the localiser from the right, X miles from touchdown, report established."

When the aircraft reports established (on the localiser) "Descend on the ILS, QNH is xxxx, airfield elevation xyz feet". Distance from touchdown may be included.

Standard phraseology may not sound "cool" to those who watch too many movies, but everybody stands a fighting chance of getting the right message first time. Final approach is no time to start a debate on the flight deck about what the controller meant by that instruction.

instructor mode to standby
Bern Oulli is offline  
Old 12th Dec 2003, 16:20
  #3 (permalink)  
 
Join Date: Sep 2002
Location: UK
Posts: 1,294
Likes: 0
Received 0 Likes on 0 Posts
Regarding the instructor mode and this is not a go at Bern Ouilli but at a number of instructors and MATS part1 backs me up on this.
There is no need to give airfield elevation if it is already published, neither is there a need for a range from touchdown when established if there is a fully serviceable DME and why do people still insist on saying closing the localiser from the right or left.
Grrrr imagine if they said that at Heathrow Gatwick etc
Anyhow rant over

I do use the phrase further descent with the glide from time to time, sorry I didn't realise it would be ambiguous.
Basically what I am saying to the aircraft is they will not get any further descent from me until they are established so don't ask for any ( I usually descend the aircraft to platform height anyway)
Or I may clarify it by saying something like you may continue your descent with the glide path if for example I am I think a little high and want the aircraft to start his descent and he is on a closing heading to establish.
Maybe its not MATS part 1 but it has been taught to me that way at 3 separate radar units
flower is offline  
Old 12th Dec 2003, 16:44
  #4 (permalink)  

'just another atco'
 
Join Date: Aug 2000
Location: LTC Swanwick
Age: 60
Posts: 154
Likes: 0
Received 0 Likes on 0 Posts
I use "When established on the localiser, descend on the ILS" which I find quite useful on occasions.
TC_LTN is offline  
Old 12th Dec 2003, 16:54
  #5 (permalink)  
Ohcirrej
 
Join Date: Feb 2003
Location: This is the internet FFS.........
Posts: 2,921
Likes: 0
Received 0 Likes on 0 Posts
Some units have incorporated the "further with the glide path" (TC for one) into their local MATS Part 2. However, that as well is an abridged version of the correct phraseology.

"......when established on the localiser, further descent with the glide path" is used, especially during a busy sequence, and eliminates the situation of a pilot waiting, waiting, waiting to get in on the r/t to confirm they can descend further. The reason, take EGLL for example. Especially on 27, with the helicopter routes over the city, if an a/c is descending on the glide path, it is separated from the standard alititudes on the routes. Also, as our usual descent is to 4000' (as EGLC uses 3000' below us), once again, if established and descend on the G.P., the descent from 4000' at about 12 miles is also separated.

As an aside for a point of discussion, why is there the requirement for the good old "turn left heading ..., REPORT localiser established Rwy ...". I'm looking at the radar, I can see if they have established or gone through. I have never really seen the point. What's wrong with "turn left to intercept localiser Rwy..."? And I'm with Flower with the "range from touchdown" issue for straight in/on the ILS. If the driver can't get a DME range, they'll tell you and ask for it (we'll not go into the closing the localiser from the left/right!)
Jerricho is offline  
Old 12th Dec 2003, 17:11
  #6 (permalink)  

'just another atco'
 
Join Date: Aug 2000
Location: LTC Swanwick
Age: 60
Posts: 154
Likes: 0
Received 0 Likes on 0 Posts
Jerricho

I couldn't find any concession in the TC P2 to use aything other than the P1 phraseology, just a reminder in the Gen section that "When established on the localiser, descend on the ILS" as stated in P1 was available to use?

Perhaps you could point me in the direction of the reference to "further with the glide path".
TC_LTN is offline  
Old 12th Dec 2003, 19:21
  #7 (permalink)  
 
Join Date: Feb 2002
Location: Bucks. UK
Posts: 77
Likes: 0
Received 0 Likes on 0 Posts
Hello J - the reason we ask pilots to report established on the localiser is because that is the prompt for us then to issue clearance to descend on the ILS.

If that report is not forthcoming because it has not been requested, then unless conditional clearance to descend on the ILS has already been given, the controller would have to ask the pilot if he is established before giving further descent.

I know that you can see the aircraft turn onto the localiser but according to my interpretation of the Pt 1, that is not sufficient.

RTO - this has been debated before. The reason why in the UK we are not permitted to say "cleared ILS" when radar vectoring to an ILS approach is that pilots have taken such a clearance as permission to descend to the altitude at which the approach commences according to the Approach Chart, irrespective of their previously cleared altitude. In the case of Heathrow the ILS/DME approaches commence at 2500ft. An aircraft descending to 2500ft say 15 miles from touchdown on an ILS to 27L/R runs the risk of encountering other aircraft operating up to 3000ft.

brimstone is offline  
Old 12th Dec 2003, 19:39
  #8 (permalink)  
 
Join Date: Jan 2003
Location: S coast
Posts: 89
Likes: 0
Received 0 Likes on 0 Posts
ILS fraziologi

With deepest respect to Bern Oulli, the MATS Pt1 does now allow "turn left/right heading xxx report localiser established" in addition to the more verbose traditional phrase.

I suspect "further with the glide" is an abridged version of the conditional descent on the ILS which is also now permitted by the MATS Pt1...sloppy R/T, but not an incorrect procedure.

Tori
always under pressure
tori chelli is offline  
Old 12th Dec 2003, 23:35
  #9 (permalink)  
Ohcirrej
 
Join Date: Feb 2003
Location: This is the internet FFS.........
Posts: 2,921
Likes: 0
Received 0 Likes on 0 Posts
Hey TC_Ltn,

I'm sure it was in there. I'll have a hunt about for it next week. I know the EGLL LCEs encourage it, so it must have come form somewhere.

Hammy, you floating about today? Where did it come from?
Jerricho is offline  
Old 13th Dec 2003, 00:12
  #10 (permalink)  
 
Join Date: Jan 2002
Location: london
Posts: 42
Likes: 0
Received 0 Likes on 0 Posts
Good evening all.TC_LTN is quite correct,that is the phraseology we should all be using.The "when established on the localiser descend with the glidepath" is a mixture of the old and new phraseology and therefore should not be used.
The new phraseology was brought in to stop a/c being cleared for the ILS say 14 miles out and descending down to the lowest level at which the procedure starts straight away(which is why before the new phraseology we used the descend on the glidepath bit).I think there may have been an incident at some point or other that brought in the new phrase.
J see you later
HAMMY is offline  
Old 13th Dec 2003, 00:16
  #11 (permalink)  
Ohcirrej
 
Join Date: Feb 2003
Location: This is the internet FFS.........
Posts: 2,921
Likes: 0
Received 0 Likes on 0 Posts
No wonder I get hammered in my checks for my phraseology!
Jerricho is offline  
Old 13th Dec 2003, 00:57
  #12 (permalink)  
 
Join Date: Nov 1999
Location: Wivenhoe, not too far from the Clacton VOR
Posts: 319
Likes: 0
Received 0 Likes on 0 Posts
TC_LTNNothing wrong with that phrase that you use, it is in the MATS Appendix E.

I would caution a student however, that this instruction should not cause the aircraft to commence descent using the glidepath signal if outside the glidepath protected range - i.e. the aircraft established on the localiser at a level above 3,000 aal (normally).

My point was, in the main, that nowhere in the phraseology part of the MATS Pt1 does the word "glide" or "glidepath" appear, in the context of vectoring for an ILS approach. And anyway, surely one descends on a glidepath, not with a glidepath. As for "further with the glide", well, that just does not make grammatical sense.

As to whether the phraseology is too verbose for the traffic loading at some units, or should be brought into line with our continental friends, is an entirely different matter.

I grant you that distance from touchdown is not mentioned in the Phraseology bit, but I would have thought that was covered in Section 3 Chapter 2 Page 2 Para 9:

9.1 The position of an aircraft is to be passed to the pilot at least once on each leg of the circuit.

9.2 Position information for an aircraft making a straight-in approach is to be passed at least once before it commences the final descent.


Distance from touchdown, on a closing heading, constitutes position information, in my humble submission.

Herewith the sum total of phrases for use when turning an aircraft onto the localiser for an ILS approach (according to Appendix E):

Turn left/right heading (three digits, report established on the localiser.

Closing the localiser from the left/right; report established.

Descend on the ILS, QFE (pressure) millibars.

Descend on the ILS, QNH (pressure) millibars, elevation (number) feet.

When established on the localiser, descend on the ILS, QFE (pressure) millibars/QNH (pressure) millibars, Elevation (number) feet.


Now, controversial thought, perhaps the MATS needs to catch up with reality?
Bern Oulli is offline  
Old 13th Dec 2003, 01:10
  #13 (permalink)  
 
Join Date: Sep 2002
Location: UK
Posts: 1,294
Likes: 0
Received 0 Likes on 0 Posts
MATS PT 1 Catching up with reality , now theres a thought. You will be suggesting the College of ATC does the same next !!
flower is offline  
Old 13th Dec 2003, 01:22
  #14 (permalink)  
Ohcirrej
 
Join Date: Feb 2003
Location: This is the internet FFS.........
Posts: 2,921
Likes: 0
Received 0 Likes on 0 Posts
I don't know what you're talking about Flower.
Jerricho is offline  
Old 13th Dec 2003, 02:00
  #15 (permalink)  
 
Join Date: Jun 2000
Location: EU
Posts: 413
Likes: 0
Received 0 Likes on 0 Posts
I have to admit that to avoid unnecessary calls when busy I've started to just say "Cleared ILS Approach 24" [with the closing turn] to foreign crews - I still do that MATS 1 thing to the Brits (MATS 1 1-1-1.2 applies). And, no, it has never caused any confusion!
However, almost all aircraft under radar vectors at our unit will be at the platform level for the approach before commencing their closing turn in any case, so the pre-emptive descent worry doesn't apply.
1261 is offline  
Old 13th Dec 2003, 02:03
  #16 (permalink)  
 
Join Date: Aug 2003
Location: SE Asia - oops redundant
Posts: 68
Likes: 0
Received 0 Likes on 0 Posts
As a pilot, unless on a long final (perhaps westerlies at LHR), I often try to intercept the localiser and the glidepath at the same time. This avoids noisy level flight and at LGW and MAN with usually short base legs works very well as long as we can immediately get cleared to descend as we intercept the localiser.
Abroad, once cleared for the whole approach in one go, this is not an issue.
I realise that this is not an ATC issue, it is one of legislation, but it is frustrating to see that glide bug disappearing downwards whilst the frequency is occupied, knowing full well you would have been cleared anyway.
'Further descent on the glide' whilst on an intercept heading sorts out this problem and if you can't so clear someone, its a shame.
backofthedrag is offline  
Old 16th Dec 2003, 06:01
  #17 (permalink)  
 
Join Date: Jun 2001
Location: New Zealand
Age: 62
Posts: 98
Likes: 0
Received 0 Likes on 0 Posts
greetings from Downunder.

If you want to clear someone to join the localiser only, and you wish to prevent them descending early, the phrase I would use in this part of the world is "JOIN THE LOCALISER, MAINTAIN 3000FT"

There would probably be an additional "DUE TRAFFIC" or whatever the reason was. Otherwise "CLEARED ILS/DME APPROACH RUNWAY 27" means maintain the current cleared level until able to descend in accordance with the procedure.

As an aside, is the Airfield Elevation published on the chart? How prevalent is the use of QFE in Britain?
Yankee_Doodle_Floppy_Disk is offline  
Old 16th Dec 2003, 08:15
  #18 (permalink)  
 
Join Date: Sep 2003
Location: EGLL
Posts: 493
Likes: 0
Received 0 Likes on 0 Posts
The ambiguity here arises when an a/c is told told to intercept at a a certain altitude and report established this is not an instruction to decend on the g/p. An a/c must only decend when instructed either once established or after receiving the command "once established decend on the ILS" I know of a situation where a colleague of mine was told to report established at 4000ft, the a/c had been configured to decend once established, which it did. However this did not help when the controller realised that the a/c had left 4000ft with the glide against an opposite direction departure climbing to 3000ft. Technically a safe procedure, but in this instance not, owing to the pilot automatically assuming he was cleared to to decend once established. In my opinion a/c should not decend on the g/p without clearance to do so.
ILS 119.5 is offline  
Old 16th Dec 2003, 15:04
  #19 (permalink)  

Sub Judice Angel Lovegod
 
Join Date: Oct 2002
Location: London
Posts: 2,456
Likes: 0
Received 0 Likes on 0 Posts
JAAMOI, in smaller airfields in Russia and the CIS they clear you to descend on the slope to, say, 2,000', then to call. You are then handed over to TWR who give you futher descent.

This profile is, of course, impossible, so the only solution is to call 2000' at, say 3000', continue on the slope as you change freq, and then continue the descent regardless of what TWR says, but hoping that they will have cleared you below 2000' by the time you get there.

This probably explains why some CIS pilots seem to have the habit of calling level when they are still in the descent.

W
Timothy is offline  
Old 16th Dec 2003, 16:52
  #20 (permalink)  
 
Join Date: Apr 2000
Location: UK
Posts: 608
Likes: 0
Received 0 Likes on 0 Posts
At some units the ILS can be intercepted but if a descent was taken it would take the aircraft out of controlled airspace. Therefore when an aircraft reports established on the LLZ we say "Maintain 4000ft - follow the localiser" and then "descend to altitude 3000ft, further descent with the ILS"

119.5 - with regard to opposite end departures against the flow of an inbound - I always let the inbound know to maintain 4000' with the reason "opposite direction departure climbing below you". Otherwise they will only ask toconfirm the landing runway....!

So easy to screw up when using both ends in a busy enviroment.
Bright-Ling is offline  


Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.