Prestwick £3m refurb
Thread Starter
Join Date: Apr 2003
Location: Manchester
Posts: 19
Likes: 0
Received 0 Likes
on
0 Posts
Prestwick £3m refurb
ANy news on PIK terminal refurb. This was due to be completed by end of April but can't see any info on website or any pics of what it looks like.
Join Date: May 2004
Location: Ayrshire
Posts: 12
Likes: 0
Received 0 Likes
on
0 Posts
The terminal rervamp is going well, alhough most of the work being carried out is purely superficial. Check-in desks have been refurbished with some god-awful wood effect panelling. Metal railing and glass panelling along the corridor above the check-in area. Construction of the new retail outlets it underway (possibly Costa coffee and Superdrug). But best of all the carpet at checkin has gone and is replaced by some rather nice tiles.
Join Date: Oct 2002
Location: UK
Posts: 202
Likes: 0
Received 0 Likes
on
0 Posts
Last time I was there the departure area was a mess and the smell from the toilets was disgusting.
I hope some of the £3 milllion goes into keeping the place clean at least.
The trouble of relying on one low- co airline for most of it's revenue maybe?
I hope some of the £3 milllion goes into keeping the place clean at least.
The trouble of relying on one low- co airline for most of it's revenue maybe?
Join Date: Mar 1999
Location: Ashbourne Co Meath Ireland
Age: 73
Posts: 470
Likes: 0
Received 0 Likes
on
0 Posts
the smell from the toilets was disgusting.
The airport has it's moments too, especially in the ones closest to the bars