The terminal rervamp is going well, alhough most of the work being carried out is purely superficial. Check-in desks have been refurbished with some god-awful wood effect panelling. Metal railing and glass panelling along the corridor above the check-in area. Construction of the new retail outlets it underway (possibly Costa coffee and Superdrug). But best of all the carpet at checkin has gone and is replaced by some rather nice tiles.