EGCC Development - what is required?
Manchesters Most Wanted PPRuNer
Joined: Jul 1999
Posts: 818
Likes: 0
On another off topic note - what happened to the plans for a roof and enclosure structure for Concorde (as specified in the contract with BA I believe) ?
I wonder if the AVP is to be moved, job lot, over to the south side at some point as was originally planned.
I wonder if the AVP is to be moved, job lot, over to the south side at some point as was originally planned.
Keeping Danny in Sandwiches

Joined: May 1999
Posts: 1,295
Likes: 0
From: UK
I think that they should build a new Runway to the north of T2; like bury the M56 and go over the top of it. 24L is never going to be anything other than a compromise, and a dangerous one at that.
Thread Starter
Joined: Aug 1999
Posts: 978
Likes: 0
From: EGCC
Squadgy
Definately not built when the terminal/apron was being constructed.
I would have thought that with modern technology it might be cheaper to build a bridge - a'la Gatwick - and save having to dig up half the apron with all the problems incurred.
I would have thought that with modern technology it might be cheaper to build a bridge - a'la Gatwick - and save having to dig up half the apron with all the problems incurred.





