This is a disgrace.
Has it been deliberately ignored because an investigation may implicate the regulator?
Is this reporting strategy worse or better than the Westwind debacle? Two different ATSB techniques to the same problem.
I’ve been wondering when bureaucratic red tape was finally going to materialise into an actual prang.