I flew out from Luton on Sunday evening, so I thought I'd post a few pictures from inside the terminal. Apologies for quality of some of the shots through the windows, the weather was not pleasant!
In the main departure lounge, the new entrance to the existing boarding piers has opened in between Frankie & Benny's and Boots.
This is the view in the opposite direction.
This is the area where the pile driving is taking place. I think the foundations in between stands 60 and 61 are for the footbridge for stand 60 which links to the new boarding gate being built over the customs hall.
This is a view of Pier B taken from Pier A showing most of the external cladding/glazing now complete.