Originally Posted by
P2bleed
As this thread is in regards to the SAR contract, what requirements what does the actual contact require?
One aircraft, 5 days per week, day time only. There is no night offshore flying in Bass Strait, except in an emergency. Esso can look after night standby themselves without needing a contractor, as they've always done.