Originally Posted by
LTNman
Forgot to mention that today while travelling up New Airport Way I spotted that a single excavator was starting to dig out an existing embankment close to the runway and that a yellow large wheeled soil transporter was moving the soil to the south of the runway. The significance of this is that this is on the route for the new rail link.
They are moving the airfield perimeter road to accommodate the rail link route.