Think the proposal is for two trains per hour to Corby formed on electric class 387 multiple sets with interchange to services further north at Kettering (but not that frequent). The electro diesels running from 2022 will probably be slower when diesel powered than the current HSTs so to maintain journey times stops will have to be cut.