PPRuNe Forums - View Single Post - LUTON -8
Thread: LUTON -8
View Single Post
Old 13th Jun 2017, 11:55
  #6287 (permalink)  
LTNman
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,862
Likes: 0
Received 0 Likes on 0 Posts
Temporary drop off zone. It looks like passengers will cross pedestrian crossings towards Taxiway Delta to avoid crossing the road. This is going to be one hell of a walk to the terminal.



Temporary CTA layout with moved pay barriers



Permanent drop off zone within multistory car park 2 with new ring road away from Taxiway Delta, which will allow space for a new apron. If built this apron could be easily given a pier connected to new pier B. If that additional pier is built it could then be connected to the south stands.

The new multistory will be bigger than the existing one. Also noted that the exit pay barriers will be contained within the multistory so all other traffic will not be held up.



Mid term multistory. This multistory is meant to be temporary until a permanent arrangement is provided but we shall see if it is ever taken down.


Last edited by LTNman; 13th Jun 2017 at 18:10.
LTNman is offline