bpaggi
The ELEV HELIPAD 20 ft TDP symbology needs adjustment to a minimum of 35 ft for the correct usage. This was initially develloped for the intended use on oil rig (Cat A Offshore) but never completed. This simbology must be used as per the HELIPAD simbology (duplication) either ground base or elevated.
It should not to be used for Cat A Offshore procedures, this profile is not included in the simbology.
Is there any improvement or clarification with phases 7/8 that you know of?
TS