That is how Luton traditionally operates with any new capacity used up before the extra infustruture is finished.
The new terminal had a capacity of 5 million before its pier was built and before the upstairs departure lounge was brought into service with the old terminal being used as the departure lounge. That capacity was broken before it even opened.