Hybrid Air Vehicles (HAV) said repairs will take about three to four months to repair and test and were confined to the hull and the front part of the cockpit, but specialist tools needed for some of the repairs had been scrapped by the US Army and needed replacing, which would "contribute significantly to the estimated overall time required".