how about the fact that the cost to "fix" TASWAM isn't included - only to do a fully fledged radar system - why was TASWAM was installed with several issues outstanding as this report identifies which doesn't allow it to be used as was directed by the minister at the time?
The Cambridge aerodrome lights issue will be raised, within MY reply.