Nothing major to report this week.
The link building has been given a metal sheeting floor to allow concrete to be poured on both the first and second level.
The last to be built third core has almost been completely clad.
With the two parts of the link building in the background I try to take photos off peak to avoid the crowds but even then it is sometimes impossible.
It looks like the replacement link road to the fire station is about to be opened and the first trench is being dug on the grass embankment leading to the tunnel that will become the second carriageway.
Most of the mid term car park that was closed off has now reopened and already seems full again after just 24 hours.