Cossack-Please check my understanding of what you have said.
If a 145 (JA) is departing behind a 737 (full length) only two mins separation is required?If the lead aircraft were a full length 737 and the JA aircraft a Jetstream three mins is mandatory?What about a 145 (full length) and Jetstream at JA?
Who are SRG?Thanks in advance.