The contractors for Signature have started to fit the roof. Also concreting of the first floor has taken place and the steel work for the undercover drive through is going up. The first photo shows the slope of the main apron very well.
A signpost has been put up on one of the roads for Signature terminal 1 and 2. Terminal 1 being their temporary portocabin village and Terminal 2 being the Landmark site which Signature bought out a few months ago.