PPRuNe Forums - View Single Post - LUTON -8
Thread: LUTON -8
View Single Post
Old 1st Feb 2016, 17:09
  #3539 (permalink)  
LOGICAL
 
Join Date: Jan 2006
Location: uk
Posts: 22
Likes: 0
Received 0 Likes on 0 Posts
Has there been any consideration to a rail tunnel from near the existing parkway station to under the terminal? I know tunneling can be expensive but it would overcome many obstacles such as gradient and current infrastructure and you could use escalators similar to the underground stations. It could even be designed as a loop from the mainline giving through trains in both directions.
LOGICAL is offline