PPRuNe Forums - View Single Post - LUTON -8
Thread: LUTON -8
View Single Post
Old 30th Jan 2016, 10:18
  #3534 (permalink)  
LTNman
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,888
Likes: 0
Received 0 Likes on 0 Posts
Just figured out that the 100m bridge has two supports which I have never spotted before. One is between the drop off area and the inbound road while the other sits between the two carriageways. The one in the middle of the duel carriageway has a single vertical support running through the glass. I guess then this means it will be fitted in 2 halves and joined at this point?

The new pier is shown in the background. The roadway looks very nice without the barriers, railings and fencing in place.


Last edited by LTNman; 30th Jan 2016 at 10:48.
LTNman is offline