only requirements are to give / verify QNH and type of approach - runway doesn't change that much but , for example, during 30L closures, we need to use RNAV approach to 30R as much as possible (helps the tower flowers with holding point allocation) and many operators either can't fly the RNAV or wrongly assume ILS approach as standard.