PPRuNe Forums - View Single Post - LUTON -8
Thread: LUTON -8
View Single Post
Old 27th Nov 2015, 19:41
  #3001 (permalink)  
cj241101
 
Join Date: Apr 2009
Location: Luton
Posts: 549
Likes: 0
Received 0 Likes on 0 Posts
trains and mountains

"Trains can't travel up steep hills but only gradual gradients and I don't think the trip would be long enough for the amount of height that has to be gained".


Never been to Switzerland then? Not practical in the airport's case (cost?) I'm sure but the Swiss built spiral rail tunnels inside mountains to climb far bigger hills than the one the airport sits on!
cj241101 is offline