ifitaintboeing:
Are separate check flights needed for IPC and IR(R), or can these be merged into a single flight? I.e., can the IPC be given on the basis of a successfully completed IR(R) revalidation check flight (if the extra IPC items are covered as well)?
Also, can the FE / CFI-I that gives the check flight also do the check flight prep?
Thanks,
Michael