PPRuNe Forums - View Single Post - EASA Enroute-IR minimum ceiling?
View Single Post
Old 15th October 2014 | 08:10
  #62 (permalink)  
Reely340
10 Anniversary
 
Joined: Feb 2012
Posts: 346
Likes: 4
From: LOWW
@Pace
The first you depart IFR in IMC using your IMCR you fly OCAS to destination and again fly IFR in IMC for the approach and landing
All legal with your IMCR rating
Sorry for dragging that old posting out, but how do you guys do that?
1 depart IFR in IMC
2 fly OCAS to destination
3 IFR in IMC for the approach and landing

Which section is ATC controlled?

Methinks;
Part 2 must be completely in VMC, right? (OCAS)
Hence the UK IMCR only works for controlled aerodromes w/ radar vectoring, where the part outside radar controlled departure and approach must be OCAS and VMC. How do you plan for that?

Isn't the "connecting end" of a SID an airway in CAS ?
How does on bend a SID to end in the en-route OCAS ?

I'm certainly missing something here, pls elaborate on UK IMCR?

Last edited by Reely340; 15th October 2014 at 08:28.
Reely340 is offline  
Reply