Artists impression from one side of the new dual carriageway of the walkway over the drop off area and entry and exit routes. When phase 3 is built it will be attached to a multistory car park
Looking back from close to taxiway Delta of the drop off area and new pier. As can be seen it looks the same as the existing airside pier and would require no work if a new apron was ever built in the short term car park. The departure gates on this side will be used to coach passengers to the south stands.