PPRuNe Forums - View Single Post - When is the next cull at QF Engineering?
View Single Post
Old 24th Jun 2014, 03:36
  #743 (permalink)  
ALAEA Fed Sec
 
Join Date: Nov 2007
Location: Bexley
Posts: 1,792
Likes: 0
Received 0 Likes on 0 Posts
Hey guys. I am just chasing something up. Last Fri at our consultation meeting, Tony Lowrey told us something that we think may fall into the horse crap category. Hoping someone in the know, Maintenance Watch maybe could call me to confirm.


The company has assigned 3.5 hours to each 738 check 2 and are using that in the calculations to determine how many people will be sacked. We checked on Mxi the night before the meeting and the average check 2 had 9.2 hours of assigned work and an unknown allocation for defects etc.....


Now the Texan said that it was greater than normal atm because they are bringing forward work whilst they have additional staff. Have MW being doing this purposely, have they been instructed too and is it really the case?
ALAEA Fed Sec is offline