Dave - to play devil's advocate, no new runway would be operational before 2020. Assuming an average of modest growth over the years. LHR has lower frequency larger aircraft where a less constrained airport might see higher frequency smaller aircraft on some routes. Furthermore, operating at 99% capacity every day indicates non-sustainability.
So why not 2 runways at the same time ?